My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to PSA - Major Additions Morris Performing Arts Center – RATIO Architects, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 1 to PSA - Major Additions Morris Performing Arts Center – RATIO Architects, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 7:59:44 AM
Creation date
4/11/2023 3:08:20 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This isEXHIBIT J, consisting ofsix (6) pages, referred to <br />in and part of the Agreement between Owner and <br />Architect for Professional Services date December21, <br />2021. <br />Special Provisions <br />The following is the Architect's Design Services Proposal prepared in advance of this Agreement. <br />November 1, 2021 <br />Jeff Jarnecke <br />Executive Director of Venues <br />City of South Bend, Venues Parks & Arts <br />120 Dr. Martin Luther King Jr. Blvd. <br />South Bend, Indiana 46601 <br />Re: Morris PAC Renovation, Addition and Site Proposal <br />Dear Jeff: <br />Thank you for the opportunity for RATIO to propose services for the Morris Performing Arts Center (MPAC) <br />renovations in South Bend, Indiana. Renovating and expanding a historically significant building, such as the <br />Morris, and doing so in a way that respects it yet improves the existing facility, requires thoughtful and careful <br />planning. We are extremely excited to re -envision this civic source of pride and offer the following services <br />proposal for your consideration. <br />PROJECT SCOPE <br />The project consists of major renovations and additions to South Bend's MPAC facility and grounds bounded to <br />the north by West Lasalle Ave, to the east by Doctor M.L.K. Jr. Blvd, to the south by West Colfax Ave and to the <br />west by North Main Street. The scope breaks down into four major components. These components include <br />MPAC renovations, a building addition, re -visioned Jon Hunt Memorial Plaza, and a parking structure. The <br />construction budget for the total project including all four components is $18.30M. The Concept Design for these <br />components is generally described in the presentation document dated April 21, 2021. <br />Pagel <br />(Exhibit J - Special Provisions) <br />EJCDC E-500 Agreement Between Owner and Engineer for Pfessional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All righteserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.