My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to PSA - Major Additions Morris Performing Arts Center – RATIO Architects, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 1 to PSA - Major Additions Morris Performing Arts Center – RATIO Architects, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 7:59:44 AM
Creation date
4/11/2023 3:08:20 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• . • , <br />• • • sa�ssr�rss. <br />_ WIMPIrprm <br />ZF <br />Selecting Independent Testing Laboratory: <br />independent testing laboratory to perform the <br />B2.01.0. <br />Assist Owner in the selection of an <br />services identified in Exhibit B, Paragraph <br />4. Pre -Construction Conference: Participate in a Pre -Construction Conference prior to <br />commencement of Work at the Site. <br />Schedules: Receive, review, and determine the acceptability of any and all schedules that <br />Contractor is required to submit to Architect, including the Progress Schedule, Schedule of <br />Submittals, and Schedule of Values. <br />6. Baselines and Benchmarks: As appropriate, establish baselines and benchmarks for <br />locating the Work which in Architect's judgment are necessary to enable Contractor to <br />proceed. <br />7. Visits to Site and Observation of Construction: In connection with observations of <br />Contractor's Work while it is in progress: <br />a. Make visits to the Site at intervals appropriate to the various stages of construction, as <br />Architect deems necessary, to observe as an experienced and qualified design <br />professional the progress of Contractor's executed Work. Such visits and observations <br />by Architect, and the Resident Project Representative, if any, are not intended to be <br />exhaustive or to extend to every aspect of Contractor's Work in progress or to involve <br />detailed inspections of Contractor's Work in progress beyond the responsibilities <br />specifically assigned to Architect in this Agreement and the Contract Documents, but <br />rather are to be limited to spot checking, selective sampling, and similar methods of <br />general observation of the Work based on Architect's exercise of professional <br />judgment, as assisted by the Resident PFeeet Representative, y. Based on <br />information obtained during such visits and observations, Architect will determine in <br />general if the Work is proceeding in accordance with the Contract Documents, and <br />Architect shall keep Owner informed of the progress of the Work. <br />b. The purpose of Architect's visits to, and representation by the Resident Pr-0jee <br />Representative, if , at the Site, will be to enable Architect to better carry out the <br />duties and responsibilities assigned to and undertaken by Architect during the <br />Construction Phase, and, in addition, by the exercise of Architect's efforts as an <br />experienced and qualified design professional, to provide for Owner a greater degree of <br />confidence that the completed Work will conform in general to the Contract <br />Documents and that Contractor has implemented and maintained the integrity of the <br />design concept of the completed Project as a functioning whole as indicated in the <br />Page5 <br />(ExhibitA —Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright O 2008 National Society of Profssicnal Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.