My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to PSA - Major Additions Morris Performing Arts Center – RATIO Architects, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 1 to PSA - Major Additions Morris Performing Arts Center – RATIO Architects, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 7:59:44 AM
Creation date
4/11/2023 3:08:20 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• . IMOrtsses!r9r. PIq MFVM 1%W <br />• <br />• <br />A- MINI <br />A1.02 Preliminary Design Phase <br />A. After acceptance by Owner of the Report and any other deliverables, selection by Owner of a <br />recommended solution and indication of any specific modifications or changes in the scope, extent, <br />character, or design requirements of the Project desired by Owner, and upon written authorization <br />from Owner, Architect shall: <br />Prepare Preliminary Design Phase documents consisting of final design criteria, <br />preliminary drawings, outline specifications, and written descriptions of the Project. <br />2. Provide necessary field surveys and topographic and utility mapping for design purposes. <br />Utility mapping will be based upon information obtained from utility owners. <br />3. Advise Owner if additional reports, data, information, or services of the types described in <br />Exhibit B are necessary and assist Owner in obtaining such reports, data, information, or <br />services. <br />4. Based on the information contained in the Preliminary Design Phase documents, prepare a <br />revised opinion of probable Construction Cost, and assist Owner in collating the various <br />cost categories which comprise Total Project Costs. <br />5. Perform or provide the following additional Preliminary Design Phase tasks or <br />deliverables: No additional tasks or deliverables <br />6. Furnish two (2) review copies of the Preliminary Design Phase documents and any other <br />deliverables to Owner within ten (10) business days of authorization to proceed with this <br />phase, and review them with Owner. Within ten (10) business days of receipt, Owner shall <br />submit to Architect any comments regarding the Preliminary Design Phase documents and <br />any other deliverables. <br />7. Revise the Preliminary Design Phase documents and any other deliverables in response to <br />Owner's comments, as appropriate, and furnish to Owner two (2) copies of the revised <br />Preliminary Design Phase documents, revised opinion of probable Construction Cost, and <br />any other deliverables within ten (10) business days after receipt of Owner's comments. <br />B. Architect's services under the Preliminary Design Phase will be considered complete on the date <br />when the revised Preliminary Design Phase documents, revised opinion of probable Construction <br />Cost, and any other deliverables have been delivered to Owner. <br />Page2 <br />(ExhibitA —Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright O 2008 National Society of Profssienal Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.