Laserfiche WebLink
Contractor: Rieth-Riley Construction Co., Inc. <br />Work Completed from <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />PAYMENT APPLICATION <br />11/4/2022 to Final <br />Application No 3 (Final) <br />Project No. 122-032 <br />Project Name: <br />2022 Contractor Paving <br />Round 2 <br />No. <br />Description <br />QUANTITY <br />UNIT <br />UNIT PRICE <br />Dols. Cent <br />EXTENSION <br />Dols. Cent <br />Contract <br />This Est <br />Total <br />1 <br />Maintenance of Traffic <br />1 <br />0 <br />1 <br />LS <br />$74,819.33 <br />$74,819.33 <br />2 <br />Mobilization and Demobilization <br />1 <br />0 <br />1 <br />LS <br />$115,564.59 <br />$115,564.59 <br />3 <br />Milling, 2" <br />4423 <br />0 <br />4200 <br />Sy <br />$4.28 <br />$17,976.00 <br />4 <br />Milling, 3" <br />45114 <br />0 <br />46185 <br />Sy <br />$4.01 <br />$185,201.85 <br />5 <br />HMA Surface, 9.5 mm - Type B <br />5281 <br />0 <br />5731.7 <br />TONS <br />$131.31 <br />$752,629.53 <br />6 <br />HMA Intermediate, 12.5mm - Type B <br />3720 <br />0 <br />4033.44 <br />TONS <br />$117.85 <br />$475,340.90 <br />7 <br />HMA for Patching <br />160 <br />0 <br />71.16 <br />TONS <br />$391.28 <br />$27,843.48 <br />8 <br />Tack Coat <br />20 <br />3.47 <br />22.64 <br />TONS <br />$705.71 <br />$15,977.27 <br />9 <br />Joint Adhesive, Surface <br />20435 <br />0 <br />22795 <br />LF <br />$0.73 <br />$16,640.35 <br />10 <br />Adjust Manhole to Grade <br />15 <br />0 <br />0 <br />EA <br />$632.23 <br />$0.00 <br />11 <br />Adjust Water Valve Structure to Grade <br />6 <br />0 <br />0 <br />EA <br />$512.63 <br />$0.00 <br />12 <br />Adjust Inlet to Grade <br />10 <br />0 <br />0 <br />EA <br />$632.23 <br />$0.00 <br />13 <br />Line, Thermoplastic, Solid, White, 6" <br />198 <br />0 <br />276 <br />LF <br />$2.56 <br />$706.56 <br />14 <br />Transverse Marking, Thermoplastic, Solid, <br />White, 24" <br />83 <br />0 <br />90 <br />LF <br />$10.60 <br />$954.00 <br />15 <br />Concrete Curb Ramp, Removal <br />1461 <br />0 <br />1086.9 <br />Sy <br />$63.10 <br />$68,583.39 <br />16 <br />Concrete Curb Ramp, Installation <br />1461 <br />0 <br />1086.9 <br />Sy <br />$203.44 <br />$221,118.94 <br />17 <br />Concrete Curb, Replacement <br />602 <br />22 <br />388 <br />LF <br />$79.86 <br />$30,985.68 <br />18 <br />Concrete Curb, Replacement Undistributed <br />500 <br />0 <br />0 <br />LF <br />$79.73 <br />$0.00 <br />19 <br />Concrete Header, 6"w x 12"d <br />35 <br />0 <br />0 <br />LF <br />$188.00 <br />$0.00 <br />20 <br />Milling, 1.5" <br />130361 <br />0 <br />15546 <br />SY <br />$2.95 <br />$45,860.70 <br />21 <br />Line, Thermoplastic, Solid, White, 4" <br />296 <br />0 <br />385 <br />LF <br />$1.35 <br />$519.75 <br />22 <br />Line, Thermoplastic, Solid, Yellow, 4" <br />176 <br />0 <br />240 <br />LF <br />$1.35 <br />$324.00 <br />23 <br />Line, Thermoplastic, Broken, White, 4" <br />90 <br />0 <br />30 <br />LF <br />$1.55 <br />$46.50 <br />24 <br />Grooving for 4" <br />562 <br />0 <br />0 <br />LF <br />$1.85 <br />$0.00 <br />25 <br />Pavement Message Markings, Thermoplastic, <br />Lane Indication Arrow <br />21 <br />0 1 <br />2 1 <br />EA 1 <br />$155.001 <br />$310.00 <br />Deductions <br />Retainage $0.00 <br />Liq.Dam. $0.00 <br />$0.00 <br />Approved <br />/lyA 3/23/2023 <br />Construction Manager - Kyle Ludlow Date <br />Contractor Date <br />Total $2,051,402.83 <br />Deductions $0.00 <br />Sub Total $2,051,402.83 <br />Prev. Pmts $1,944,837.24 <br />AMOUNT DUE $106,565.59 <br />