My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 2 - North Water Treatment Plant Improvements Proj No. 119-011 - Bowen Engineering Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Change Orders
>
Change Order No 2 - North Water Treatment Plant Improvements Proj No. 119-011 - Bowen Engineering Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2023 3:05:00 PM
Creation date
4/11/2023 3:04:57 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND <br />DEPARTMENT OF PUBLIC WORKS <br />PROJECT CHANGE ORDER <br />DATE: <br />PROJECT NO: <br />PROJECT NAME: <br />CONTRACT DATE: <br />CHANGE ORDER NO. <br />SUBJECT OF CHANGE ORDER: Decrease the contract for less work required than contracted on <br />the raw water header replacements. Note: CO1 had an incorrect <br />original contract sum which has been corrected here. <br />The original contract sum $ <br />Net change by previously authorized change orders $ <br />The contract sum prior to this change order $ <br />By this Change Order, the project amount is Increased <br /> Decreased $ <br />The new contract sum including this change order $ <br />This Change Order represents a total change of % <br />Total change for entire project % <br />Original contracted completion date/time <br />Extension of date/time by previous change orders <br />Date/time extension by this change order <br />New completion date/time <br />RECOMMENDED FOR APPROVAL <br />CONTRACTOR <br />PROJECT MANAGER <br />CITY OF SOUTH BEND <br />BOARD OF PUBLIC WORKS <br />Approved Date: <br />Contractor Signature <br />Printed Name and Title Elizabeth A. Maradik, President <br />Company name <br />Gary A. Gilot, Member <br />Address Jordan V. Gathers, Member <br />City, State, Zip <br />Joseph R. Molnar, Vice President <br />Murray L. Miller, Member <br />03/17/2023 <br />North Water Treatment Plant Improvements 4/26/2022 <br />119-011 <br />2 <br />3,582,800.00 <br />14,513.00 <br />3,597,313.00 <br />45,673.00 <br />3,551,640.00 <br />(1.27) <br />(1.23) <br />Substantial: 8/15/22, Final 9/15/2022 <br />Substantial: 5/4/22, Final 6/2/2022 <br />260 days <br />X <br />Mitchell Stull, Sr. Project Engineer <br />Bowen Engineering <br />8802 N. Meridian St <br />Indianapolis, IN, 46260 <br />April 11, 2023
The URL can be used to link to this page
Your browser does not support the video tag.