My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Century Center Parking Lot Seal and Stripe Proj No. 122-060B - Asphalt Restoration Services
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Quotes - Century Center Parking Lot Seal and Stripe Proj No. 122-060B - Asphalt Restoration Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 10:30:08 AM
Creation date
4/11/2023 3:01:28 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. The cost for resetting parking blocks shall be paid for at the contract unit price as indicated on the <br />itemized proposal sheet for'PARKING BLOCK, RESET... EACH.' <br />3. The cost for new parking blocks shall be paid for at the contract unit price as indicated on the <br />itemized proposal sheet for'PARKING BLACK, NEW.... EACH'. <br />XIX. LIQUID ASPHALT <br />A. Prevailing Specifications: 2022, INDOT Standard Specifications Section: 401, 408 <br />B. Additions: <br />1. This work shall include crack repair and sealing of the existing asphalt. <br />2. Materials: <br />a. Hot rubberized crack sealant <br />b. Star -Seal asphalt pavement sealer or approved equal. Available from Specialty Technology <br />and Research, 1400 Walcutt Rd., Columbus, Ohio 43228, (614) 870-0744. <br />c. Sand and latex per manufacturer recommendations. <br />3. Submittals: Manufacturer product data. <br />4. Clean and fill all major cracks within the existing parking lot. <br />5. Clean the entire area to be sealed of dirt and debris. Apply two coats of sealer. <br />6. Measurement and Payment <br />a. Crack repair filler, sealer, and all other incidental materials and labor necessary for the <br />completion of sealing the lot shall be included in the cost of the pay item. <br />b. This work shall be paid for at the contract unit price as indicated on the itemized proposal sheet <br />for'LIQUID ASPHALT ... SYS' <br />XX. POTHOLE PATCHING <br />A. Prevailing Specifications: 2022, INDOT Standard Specifications 304 <br />B. Additions: <br />1. Mill out damaged areas to a minimum of 2". Remove and clean areas. Install surface asphalt to be <br />level and compact. <br />2. The Contractor will work with the Owner to mark out areas needed to be patched. <br />3. This work shall be paid for at the contract unit price as indicated on the itemized proposal sheet for <br />'POTHOLE PATCHING ... SIFT <br />XXI. PAVEMENT MARKINGS <br />A. Prevailing Specifications: 2022, INDOT Standard Specifications 808, 909 <br />B. Additions: <br />1. Permanent pavement markings shall be paint at all locations within parking lot, unless otherwise <br />specified. <br />2. Angled Stripe pavement marking areas include both accessible parking stall access aisles and any <br />other angled striping areas such as access to the water utility equipment, parking bay end caps, <br />and make-ready area. Areas called out separately, by purpose, on plans for reference only. Area <br />of measurement for payment shall be based not on actual paint application but on overall square <br />footage of the designated area. <br />3. This work shall be paid for at the contract unit price as indicated on the itemized proposal sheet as <br />follows: <br />a. PAVEMENT MARKING, PAINT, 4 IN... LFT <br />b. PAVEMENT MARKING, PAINT, ANGLED STRIPE... LFT <br />c. PAVEMENT MARKING, PAINT, ACCESSIBLE PARKING SYMBOL... EACH <br />XXII. PLANS <br />A. Prevailing Specifications: City of South Bend Design and Construction Standards <br />B. Additions: <br />1. The plans consist of 2 Sheets. <br />2. The work shall conform to the plans. <br />3. The drawings are schematic in nature. <br />4. The CONTRACTOR is responsible for estimating dimensions and quantities of materials. <br />5. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall govern. <br />Version 06/01/2022 Page - 6 Public Works Quote <br />Scanned With CamScanner <br />
The URL can be used to link to this page
Your browser does not support the video tag.