My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCA - South Well Field Backwash Line Relocation Proj No. 117-059C - HRP Construction Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Project Completion Affidavits
>
PCA - South Well Field Backwash Line Relocation Proj No. 117-059C - HRP Construction Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 11:25:55 AM
Creation date
3/28/2023 1:58:43 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/28/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bond No. MNT9412023 <br />KNOW ALL MEN BY THESE PRESENTS: <br />That HRP Construction Inc. PO Box 266 5777 Cleveland Rd South Bend, IN 46624-0266 <br />as Principal, hereinafter call Contractor, and Fidelity and Deposit Company of Maryland <br />Chicago, IL 60606 , as Surety, hereinafter call Surety, are held and firmly bound unto <br />City of South Bend Board of Public Works_, as Obligee, hereinafter called Owner, in the penal sum of <br />$ $23,359.00 , for the payment whereof Contractor and Surety bind themselves, their heirs, executors, <br />administrators, successors, and assigns, jointly and severally, firmly by these presents. <br />WHEREAS, Contractor has by written agreement, dated September 13, 2022 1 <br />entered into a contract with Owner forfl;ntith Well RPM R:;nkw;;qh I 4np Rpinnafinn, Pwig-rt Un 117-n-5qC I <br />in accordance with the General Conditions, the Drawings and Specifications, which contract is by reference incorporated herein, <br />and made a part hereof, and is referred to as the Contract. <br />NOW, THEREFORE, the condition of this obligation is such that, if Contractor shall remedy any defects due to faulty materials or <br />workmanship, and pay for any damage to other work resulting therefrom, which shall appear within a period of three (3) year(s) <br />from the date of substantial completion of the work provided for in the Contract, then this obligation to be void; otherwise to <br />remain in full force and effect. <br />Bond shall be effective from December 14, 2022 to December 14, 2025. <br />PROVIDED, HOWEVER, that Owner shall give Contractor and Surety notice of observed defects with reasonable promptness. <br />SIGNED and sealed this 12th day of December .2022 <br />HRP Construction Inc. <br />Principal <br />By L (Seal) <br />Matthew D. Cain,- P-r- ident <br />Fidelity and Deposit Company of Maryland <br />wcom <br />SEAL i fi <br />ifer L K/asznia,Attorney-in-Fact <br />
The URL can be used to link to this page
Your browser does not support the video tag.