Laserfiche WebLink
Page 7 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />completion and readiness for final payment of Contractor as set forth in the Construction Contract. <br />Engineer’s Construction Phase fees are based on the Construction Phase being completed in no <br />more than four (4) months from the date of the Construction Contract being awarded. <br />C.Limitation of Responsibilities: Engineer shall not be responsible for the acts or omissions of any <br />Contractor, Subcontractor or Supplier, or other individuals or entities performing or furnishing any <br />of the Work, for safety or security at the Site, or for safety precautions and programs incident to <br />Contractor's Work, during the Construction Phase or otherwise. Engineer shall not be responsible <br />for the failure of any Contractor to perform or furnish the Work in accordance with the Contract <br />Documents. <br />PART 2 – ADDITIONAL SERVICES <br />A2.01 Additional Services Requiring Owner’s Written Authorization <br />A.If authorized in writing by Owner, Engineer shall furnish or obtain from others Additional Services <br />of the types listed below. <br />1.Preparation of applications and supporting documents (in addition to those furnished under <br />Basic Services) for private or governmental grants, loans, or advances in connection with <br />the Project; preparation or review of environmental assessments and impact statements; <br />review and evaluation of the effects on the design requirements for the Project of any such <br />statements and documents prepared by others; and assistance in obtaining approvals of <br />authorities having jurisdiction over the anticipated environmental impact of the Project. <br />2.Services to make measured drawings of or to investigate existing conditions or facilities, or <br />to verify the accuracy of drawings or other information furnished by Owner or others. <br />3.Services resulting from significant changes in the scope, extent, or character of the portions <br />of the Project designed or specified by Engineer or its design requirements including, but <br />not limited to, changes in size, complexity, Owner’s schedule, character of construction, or <br />method of financing; and revising previously accepted studies, reports, Drawings, <br />Specifications, or Contract Documents when such revisions are required by changes in <br />Laws and Regulations enacted subsequent to the Effective Date or are due to any other <br />causes beyond Engineer’s control. <br />4.Services required as a result of Owner’s providing incomplete or incorrect Project <br />information to Engineer. <br />5.Providing renderings or models for Owner’s use. <br />6.Undertaking investigations and studies including, but not limited to, detailed consideration <br />of operations, maintenance, and overhead expenses; the preparation of financial feasibility <br />and cash flow studies, rate schedules, and appraisals; assistance in obtaining financing for <br />the Project; evaluating processes available for licensing, and assisting Owner in obtaining <br />process licensing; detailed quantity surveys of materials, equipment, and labor; and audits or <br />inventories required in connection with construction performed by Owner.