Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> Page 1 of 1 4175 New Vision Drive ● Fort Wayne, IN 46845 ● 260-490-1025 ● www.eri.consulƟng <br /> <br />February 22, 2023 <br /> <br />Zach Hurst <br />City of South Bend <br />South Bend, IN <br /> <br />Subject: Pure Green – TIF Site Plan Preparation <br /> Additional Services <br /> <br /> <br />Dear Elam, <br /> <br />This letter is provided to outline additional expenses to our Firm outside the scope of the original letter <br />agreement dated August 18, 2022. This letter is for information only and will be followed by future invoices if you <br />concur with the item listed below. <br /> <br />1. Acquire survey of the As-built conditions in the field. <br />2. Modify TIF documents with changes including, but not limited to: <br />a. Reconstruction of the east parking lot (including base and surface). <br />b. Reconstruction of landscape islands in the west parking lot. <br />c. Reconstruction of the east concrete approach. <br />d. Landscaping modifications to protect existing AEP service line. <br />e. Removal of Landscaping around existing detention basin. <br />f. Removal of Hydroseeding from southeast corner of project. <br />g. Removal of southern roadway along east side of building. <br />h. Relocation of existing fire hydrant in compliance with local fire department. <br />3. Provide cost estimate for project which is less than $450,000 total for use by the city in accordance <br />with bid documents. <br /> <br />As-Built Survey: $7,000 <br />Update Design Plans: $12,000 <br />Opinion of Probable Cost: $2,000 <br />Assistance w/ Rebidding: $2,000 <br /> <br />Total Additional Service Fee: $23,000 <br /> <br />Please feel free to call if you would like to discuss. <br /> <br />Sincerely, <br /> <br /> <br />Mark Reinhard, P.E. <br />Vice President