Laserfiche WebLink
Resurrection Lutheran Annexation Area 6 <br /> <br /> <br /> <br />SECTION III. MUNICIPAL SERVICES <br /> <br />A. Public Works <br /> <br />Sewer – A 36”-diameter sanitary sewer runs along Nimtz Parkway, while a 12”-diameter <br />sanitary sewer runs along Olive Road. Sanitary sewers discharge to a lift station on Nimtz <br />Parkway. Resurrection Lutheran Academy is already connected to the sewer, so the <br />annexation is not expected to impact capacity. <br /> <br />Development of the site requires City approval of a drainage plan that meets the City’s <br />requirement to store on site all runoff from developed areas. Connection to the City storm <br />sewer is not permitted. <br /> <br />Water - The South Bend Water Works currently has a 16” water main on Olive Road and a 12” <br />water main on Nimtz Parkway. This water main would provide sufficient capacity for the <br />Annexation Area. Resurrection Lutheran Academy is already connected to City water. <br /> <br />Extensions of or taps into sanitary sewer and water lines shall be governed by state law and <br />the rules and regulations of the South Bend Water Works and Sewer Utility. The Annexation <br />Area may be subject to system development charges for both water and sewer services. <br /> <br />Streets – All or most of the adjoining Nimtz Parkway and Olive Road rights-of-way are already <br />within city limits. The property owner may need to provide sidewalks upon future <br />development. <br /> <br />Street Lighting – Nimtz Parkway has street lighting, and one streetlight on Olive Road is <br />adjacent to the annexation area. Should any additional street lighting be necessary, it can be <br />provided on wood poles with overhead wiring through an ongoing contract with Indiana <br />Michigan Power. If the owner wishes to construct and dedicate additional street lighting, <br />especially of a decorative nature or with underground wiring, the City may accept it for <br />maintenance and operation, supported by property tax revenue. <br /> <br />Waivers of Annexation – No waivers of right to remonstrate against annexation are in effect <br />for this area. <br /> <br />2022 Actual Budget Report for the Department: <br /> <br />Expenditures: $29,003,569 <br />Miles of Roadway in City: @502 <br />Cost per Mile: @$57,776 <br />New Mileage within Area: @0.0 miles (0 feet) <br />Estimated Maintenance Cost <br /> for Annexation Area per year: @$0