My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Coal Line Trail, Phase III Proj No. 123-007 - Lochmueller Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Proposals - Coal Line Trail, Phase III Proj No. 123-007 - Lochmueller Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2023 11:32:53 AM
Creation date
3/14/2023 11:32:45 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LOCHMUELLER GROUP | CITY OF SOUTH BEND COAL LINE TRAIL PHASE 3 5 <br /> <br />COAL LINE TRAIL PHASE 3 TRAILHEAD <br />LINCOLN WAY WEST & WILBUR STREET <br />Crossing at existing signalized intersection <br />requires Accessible Pedestrian Signals <br />PROJECT MAP <br />A FIRST LOOK <br />COMMERCIAL NODE <br />Existing businesses and future redevelopment <br />incentives exist with enhanced visibility to trail users <br />and contribute to trail-user safety, plus compliments <br />the Near West Side Neighborhood Gateway. <br />BADUR HOUSE SIDE YARD <br />Probability of a Full Section 106 Review <br />is LOW if path is adjacent to side yard. <br />BADUR HOUSE <br />MATURE TREES <br />Run along west side of street <br />BRICK PAVED STREET <br />Brick street begins at <br />Werwinski. Full Section <br />106 probability trigger <br />is low. <br />ROUTE C: LWW TO COLLEGE <br />Full Section 106 probable by locating <br />path adjacent to Bottling House <br />ROUTE B: LWW TO RR ROW <br />Route avoids Full Section 106 Trigger <br />OVERHEAD ELECTRIC UTILITY POLES <br />Run along east side of street <br />CROSSING REQUIREMENTS <br />Curb ramps and crosswalks are necessary <br />at EACH PATH CROSSING, which may <br />require temporary or permanent <br />ROW to construct. <br />ROUTE A: WILBUR TO RUPEL <br />Narrow ROW is a distinct <br />challenge for this possible <br />path route. <br />EXISTING SIGNALIZED SECTION <br />CURB RAMPS & CROSSWALKS <br />STATE CLEAN-UP SITE <br />LEAKING UNDERGROUND TANK <br />HISTORIC PROPERTY <br />COAL LINE TRAIL <br />CONNECTION ROUTE A <br />CONNECTION ROUTE B <br />CONNECTION ROUTE C <br />RR ROW OPTION <br />COLLEGE STREET OPTION <br />COMMERCIAL NODE <br />THE DREAM CENTER <br />DEMOLISHED INDIANA GLASS <br />SITE & SOUTH BEND BREWING <br />ASSOCIATION BUILDINGS <br />+ Notable Property <br />+ Brownfleld Property <br />+ National Historic Register: <br />Full Section 106 Probable <br />Trigger BOTTLING HOUSE <br />5 MID-BLOCK CROSSINGS <br />Along Railroad ROW
The URL can be used to link to this page
Your browser does not support the video tag.