Laserfiche WebLink
LOCHMUELLER GROUP | CITY OF SOUTH BEND COAL LINE TRAIL PHASE 3 3 <br /> <br />PROJECT MANAGEMENT <br />BARBIE SWIHART-STUTZMAN, PE | PROJECT MANAGER <br />Barbie Swihart-Stutzman, PM, is one of Lochmueller’s most <br />versatile engineers, with over 17 years of experience spanning <br />the project development process from feasibility studies <br />through contract letting. She has developed specialized <br />expertise in designing urban thoroughfares, trails, <br />maintenance-of-traffic (MOT), sanitary and storm sewers, <br />erosion control, utility coordination, construction cost <br />estimation, plan preparation, and documentation. <br />Lochmueller has confidence in Barbie to manage the Coal <br />Line Trail Phase 3 project from design to completion. <br /> <br />+ CHESSIE TRAIL* | City of La Porte | Project Engineer <br />+ NINTH STREET TRAIL* | City of Goshen | Project Engineer <br />+ RILEY TRAIL* | City of Greenfleld | Project Manager <br />+ COLD SPRING TRAIL | City of Indianapolis | Project Engineer <br />+ RIVERSIDE TRAIL, PHASE II | City of South Bend | Project Engineer <br />+ LINCOLN WAY WEST ROAD REDESIGN | City of South Bend | Project Engineer <br />RELEVANT,VERSATILE, & LOCAL URBAN TRAIL, PARK, & ROADWAY PROJECT EXPERIENCE <br />*Please see page 11 for more details about these projects <br />+ BS, Civil Engineering, <br />Tri-State University, Angola, IN, 2005 <br />+ Professional Engineer: IN <br />+ INDOT Certifled Site Manager <br />+ INDOT Certifled PE/PS Training <br />+ INDOT Certifled Technician Testing <br />+ INDOT Certifled Utility Coordinator <br />+ LPA Consultant Project Manager <br />Certiflcation NINTH STREET TRAIL | CITY OF GOSHEN <br />Lochmueller provided design services for the <br />historic renovation of Leeper Park, South <br />Bend’s oldest park. Careful attention was <br />made to restore the paths and landscaping to <br />George Kessler’s original design. <br /> <br />BARBIE SWIHART-STUTZMAN, PE <br /> <br />Project elements included: <br /> <br />+ Restoration and Installation of the Historic <br />Studebaker Fountain <br />+ Riverbank Overlook <br />+ Trafflc Calming <br />+ Pond Removal <br />+ Updated ADA Pathways <br />+ Formal Garden and Landscaping <br />+ Lighting Design <br />$2.2M | LET DATE APRIL 2019 <br />+ Design Services <br />+ ADA Pathways <br />+ Trafflc Calming <br />+ Historic Elements <br />+ Public Outreach <br />PROJECT <br />RELEVANCY <br />LEEPER PARK | CITY OF SOUTH BEND