Laserfiche WebLink
Andrew Cunningham, PLA, LEED AP <br />Vice President <br />acunningham@jpr1source.com <br />AUTHORIZED NEGOTIATOR <br />Jones, Petrie, Rafinski Corporation (JPR) is honored to have the opportunity to <br />submit our Letter of Interest to the City of South Bend to provide engineering services <br />for the Coal Line Trail Phase 3 project. Our firm has extensive experience providing local <br />communities with effective and aesthetically pleasing pedestrian improvement projects and <br />is excited to bring the same level of commitment to this project. To accomplish this, JPR has <br />assembled a highly qualified team to successfully deliver all aspects of the project with the quality <br />of work the City of South Bend expects from its consultants. We appreciate your consideration of our <br />firm and will demonstrate in the following pages why JPR should be a trusted partner for this project. <br />The JPR team has designed <br />countless streetscape, park, and <br />trail projects giving us a thorough <br />understanding of all applicable <br />standards including INDOT, <br />PROWAG, and ADA requirements. <br />Additionally, with several new hires, <br />the JPR team has 100% capacity <br />and availability to design the best <br />project possible for the City. <br />CAPACITY & QUALIFICATIONS <br />Michael Voll has been a part of <br />numerous pedestrian improvement <br />projects from every point of view. <br />As a designer, project manager, <br />and construction inspector for <br />various projects, Michael is <br />prepared to provide a quality <br />product and foresee potential <br />conflicts before they become <br />problematic. <br />EXPERIENCED MANAGER <br />To help the City of South Bend <br />accomplish their goals, the JPR <br />team provides an efficient approach <br />to the project. Through regular <br />progress meetings, transparent <br />communication, and cost-effective <br />solutions, we strive to complete each <br />project ahead of schedule and within <br />budget. By living in the community <br />and utilizing city amenities, we have <br />an added incentive to produce the <br />best possible product. <br />FOCUSED APPROACH <br />As a smaller firm, our project pursuits are decided upon more deliberately so we can ensure constant <br />availability and quality engineering. This thorough approach to project pursuits ensures we maintain the <br />high standards we set for ourselves in accurate design, schedule, and cost estimates. <br />CITY OF SOUTH BEND <br />PE SERVICES FOR <br />COAL LINE TRAIL PHASE 3 <br />IN THE LAPORTE DISTRICT <br />DES # 2201235 <br />Jones Petrie Rafinski <br />325 S. Lafayette Blvd. <br />South Bend, IN 46601 <br />574.232.4388 <br />www.jpr1source.com <br />Existing Coal Line Trail