My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1991-11-15 Resolution 46
sbend
>
Public
>
Redevelopment Authority
>
Resolutions
>
1990-1999
>
1991
>
1991-11-15 Resolution 46
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 3:28:09 PM
Creation date
7/18/2008 3:28:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.992. Other school building projects underway arc a two year SL4 ma,Ilion addition and remodet to Pierre <br />I~iavarre Elementary School, and a 5900,000 Jesse Dickinsoa Middle School remodel, gutting the interior to <br />replace the open concept with walls to create zegular classrooms. - <br />SOjJ'i.H BEND 'Ft1BUNE plans a 51.0 million cxpa~asion on the soon-to-be cleared site of the former <br />Colfax Theater in dowatowa South Benda Proposed is a 55 million two story 25,190 sq, ft. building addition <br />to the Tribune's existing building of 225 W. Colfax The first floor will house expanded produdioa facilities <br />with about 55 million in new production equipment.. Offices will be located on the second floor and the <br />existing receiviAg paper loading dock relocated to the cast side of the addition.. With plans anal financing <br />already approved, construdion could atari early next year. <br />TTNT'tBRSII~OF NOIRE DAME eontuaucs in the midst of the largest constructior boom in the school's <br />149 year history as it begins to observe its 150th an:uversary in 1992. <br />CURRENT PROJECTS: <br />~DWA~D ~. DEBARTOLO CIrASSROOM FACILf'f'Y under construction, is the most expensive <br />building to be constructed by the University. The Si9.6 million, 130,000 aq. ft. state-of--the-art <br />educational facility will be conzpletcd by fall 1992. <br />FISCHER GRADU,~T'E STUDENT RFSI~ NCE ~PLEX with Z98 units, is being constructed in <br />two phases at the estimated cost of SI1,300,000, x'hc first phase of the project will be completed -this <br />fall, and the second by next spring, <br />ST Iyf TC EL'S LA(TNDRY is under construction behind the credit union and support sezvice building <br />o££ Douglas Road. Estimated to cost 53 million, the facility should be ready for use b'Y the second <br />...semester. <br />• j,~rgc Bmp ov rs <br />Below is a list of South Bend's lar$ecf employers. Medical services, government and educational institutions <br />reported enaploymeat includes full and pari time employees. Reported employment is according. to compamy <br />personnel or the South Bend-Mishawaka Chamber of Commerce. <br /> Reported <br />ame -lie o Business Emplavment <br />University of Notre-Dame ---- - - -~-Higher educatsoa 3,332 <br />Memorial Hospital Acute care health facility 2,800 <br />South Bend Community School Corporation Public education 2,300 <br />Allied Signal Divisions AizpIanc and auto parts 2,298 <br />St. 7oseph Medical Center Acute care health facility 1,900 <br />City of South Bend City government 1,300 <br />LTV Missiles & Electronics Military production 1,100 <br />Uniroyal Plastics Company Plastics manufacturing g,50 <br /> <br /> A-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.