My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Northwest Elevated Tank Improvements Proj No. 122-018 - Viking Painting, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Change Orders
>
Change Order No 1 - Northwest Elevated Tank Improvements Proj No. 122-018 - Viking Painting, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2023 11:25:19 AM
Creation date
2/28/2023 11:25:16 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/28/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />INTER-OFFICE MEMORANDUM <br /> <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENGINEERING <br /> <br /> <br />TO: Theresa Heffner, Clerk <br />Board of Public Works <br />FROM: Rebecca Plantz, Project Engineer <br />SUBJECT: Change Order 1, Project No. 122-018 <br />Northwest Elevated Tank Rehabilitation Project <br />DATE: February 8, 2023 <br />Change Order 1 to the Northwest Elevated Tank is to decrease the contract amount by <br />$7,745.00. This deduct is to cover a quote from Michiana Lock & Key to rekey and master key <br />locks at various locations within the City of South Bend Water Works Facilities to maintain <br />security due to the misplacement of the main key to the elevated tank. Although the gates to the <br />facility had a separate pad lock, a master key was needed to access the tower to the elevated <br />tank. The master key that could not be found by the contractor could access many other Water <br />Works facilities; therefore, the locks will be rekeyed. <br /> <br />This change order also encompasses a seasonal time extension. The original contract had a <br />substantial completion date of ninety (90) calendar days and a final completion date of one <br />hundred and twenty (120) calendar days from the date of signed Notice to Proceed for all work. <br />The Notice to Proceed was dated August 26, 2022, resulting in the completion date of <br />December 24, 2022. The contract was originally bid on June 14, 2022, leaving time for this <br />seasonal work to be complete. Due to the open market process of rejecting the first <br />unresponsive bid and addressing missing information on an open market contract, the <br />completion of the work was delayed into cold temperatures. There is a punch list of items for <br />final completion that are to be completed when the temperatures allow, including exterior paint <br />touch ups. Time has been extended by ninety-seven (97) days to March 31, 2023. <br /> <br />Please call with your questions (5998). <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.