Page 20 of 24 Construction Specification for the Installation of Steel Poles Rev. 1 <br />TLCS-1402 Specification <br />still plumb, non-shrink grout meeting the criteria of ASTM C1107 shall be placed within 72 hours <br />by tremie until it completely fills the voids around the aggregate. The ultimate compressive strength <br />of the grout shall be a minimum of 4,000 psi when tested in accordance with ASTM C109. <br />10.4 Concrete Backfill <br />All material and test equipment shall be furnished by the Constructor. <br />Direct embedded poles with concrete backfill shall be subject to the following time requirements <br />for supporting the structure during concrete curing and the start of wire stringing activities. These <br />requirements are in place to ensure that concrete strength is adequate to handle loads imposed <br />from construction activities during the curing process. It is imperative to understand the strength <br />of the concrete backfill assumed in the foundation design to appropriately apply this requirement. <br />Concrete backfill for direct embedded poles shall be tested for the first five truck loads. Concrete <br />testing shall be performed in accordance with TECS-4001 except as noted here. Initial testing shall <br />include cylinders taken for installations performed on a minimum of two separate work days. If a <br />project scope can be completed in one day, the two-day requirement may be ignored. <br />For concrete placement associated with the first five concrete truck loads, the Owner’s Engineer <br />shall provide the required duration for supporting the structures during concrete pouring and <br />curing, as well as the required cure time prior to wire stringing activities. Criteria for determining <br />these durations may include historical concrete break records for the mix design being used on <br />the project. In circumstances where concrete strength is critical, durations may extend until the <br />first breaks confirm the required strength. <br />The initial testing shall be used to determine time requirements for supporting structures during concrete <br />curing, as well as the time required before wires can be strung to the structure(s). Acceptance criteria <br />for ongoing direct embed foundations with concrete backfill shall be based on an average of the break <br />records establish in the initial test population. This may require additional concrete cylinders to be taken <br />at each location. <br />Table 3: Construction Activity and Associated Concrete Design Strength <br />Construction Activity: Design Strength Threshold: <br />Support the pole/pole section 75% <br />Wire stringing 100% <br />The Owner’s Engineer may approve time requirements, based on strength thresholds other than <br />those stated in this document via written acknowledgement that those strengths are sufficient to <br />support loads imposed during construction. <br />Ongoing concrete testing is required to show that established construction activity durations remain <br />adequate throughout the project length and timeline, including weather/seasonal variations and geologic <br />variation. At a minimum, concrete at every tenth truck load shall be tested after the initial sampling