My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to PSA - Seitz Park Reconstr., Phase I Proj No. 117-093A – Lochmueller Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 1 to PSA - Seitz Park Reconstr., Phase I Proj No. 117-093A – Lochmueller Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 8:43:36 AM
Creation date
2/14/2023 1:23:04 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT K, consisting of 4 pages, referred to in and part of <br />the Agreement between Owner and Engineer for Professional <br />Services dated February, 2021. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No.1 <br />1. Background Data: <br />a. Effective Date of Owner -Engineer Agreement: February 9, 2021 <br />b. Owner: City of South Bend <br />C. Engineer: Lochmueller Group <br />d. Project: Seitz Park Phase 1 Construction Inspection — Project Number 117-093A <br />2. Description of Modifications: <br />[NOTE TO USER: Include the following paragraphs that are appropriate and delete those not applicable to this amendment. <br />Refer to paragraph numbers used in the Agreement or a previous amendment for clarity with respect to the modifications to be <br />made. Use paragraph numbers in this document for ease of reference herein and in future correspondence or amendments.] <br />d. For the Additional Services or the modifications to services set forth above, Owner shall pay <br />Engineer the following additional or modified compensation: <br />1.) Modified Compensation: According to Exhibit A, Section A.102 (P. Duration of <br />Construction Phase) Lochmueller is entitled to an equitable increase in compensation. <br />Lochmueller is requesting that this equitable increase commence on February 1, 2023 using <br />the rate schedule attached to this amendment. <br />2.) Additional Compensation: According to Exhibit B, Section B.2.01 (A. Period of Service) <br />Lochmueller compensation amount shall be appropriately adjusted. See newly prepared <br />Appendix 3 to Exhibit C added to this amendment, which includes the hourly rate schedule and <br />fee justification. <br />e. The schedule for rendering services is modified as follows: <br />Exhibit A, Part 1— Basic Services, Section A1.05 Schedule shall be amended to: <br />Anticipated Completion Date: August 31, 2023 <br />Page 1 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright 9 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.