My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 4 - Southeast Neighborhood Center (United Way) Proj No. 119-093R - The Robert Henry Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Change Orders
>
Change Order No 4 - Southeast Neighborhood Center (United Way) Proj No. 119-093R - The Robert Henry Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2023 1:19:50 PM
Creation date
2/14/2023 1:19:45 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend Project No. 119-093R 2/14/2023 <br />Southeast Neighborhood Center (United Way) <br />Line Item Qty Unit Price Total <br />Revise Exterior Light Layout 1 LS $3,045.00 $3,045.00 <br />Parking Lot Landscape Modifications 1 LS $10,181.00 $10,181.00 <br />Shed Credit 1 LS -$1,502.00 -$1,502.00 <br />$0.00 <br />CO Total =$11,724.00 <br />Change Order #4 <br />Notes <br />Other: Allowance for purhcasing a pre-build shed was not fully <br />utilized. <br />Error: Existing condition leaves a steep elevation change at west <br />property line; install slope-embedded boulders to remedy issue. <br />Scope: One additional light fixture was added in conjunction with a <br />shift of the two planned light fixtures in the northern alley.
The URL can be used to link to this page
Your browser does not support the video tag.