My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - 2022 Rubber Speed Table Proj No. 122-014A - HRP Construction Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Change Orders
>
Change Order No 1 - 2022 Rubber Speed Table Proj No. 122-014A - HRP Construction Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2023 1:19:39 PM
Creation date
2/14/2023 1:19:37 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 of 1 <br /> <br /> <br /> <br />INTER-OFFICE MEMORANDUM <br /> <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENGINEERING <br />TO: Theresa Heffner, Clerk <br />Board of Public Works <br />FROM: Charlotte Brach, Project Engineer <br />SUBJECT: Change Order No. 1 Project No. 122-014A <br />2022 Rubber Speed Table and Speed Cushion Installation <br />DATE: February 9, 2023 <br /> <br />Change Order Number 1 for Project Number 122-014A utilizes the 20% change order limit to <br />use an existing contract to install three additional rubber speed tables on Lathrop Street. This is <br />an internally identified safety concern that we are addressing with an existing contract. The <br />contractor reduced the unit price from the original contract unit price for the change order so that <br />we could get three installed at the 20% limit. <br /> <br />Please call with any questions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.