Laserfiche WebLink
City of South Bend | PE Services for Safe Routes to School - Kennedy School - Des #2201237 | 8 <br />PROJECT APPROACH: DES. #2201237 <br />DESIGN SERVICES <br />Once all the necessary data has been collected, <br />the JPR team will develop construction plans, <br />specifications, and a cost estimate for the planned <br />improvements. The team will focus on all aspects <br />including a minimum 5-foot sidewalk width, <br />curb ramps designed to PROWAG standards, <br />and limiting construction to remain inside the <br />existing right-of-way. Additionally, the JPR team <br />will investigate the need for minor adjustments <br />to drainage structures as well as providing a <br />2-foot HMA patch in the roadway turning space if <br />advanced deterioration is observed. <br />The JPR team understands that designing <br />compliant curb ramps can be difficult due to <br />various constraints but has experience working <br />with the INDOT Technical Advisory Committee to <br />find suitable solutions for any conflict that arises. <br />XXXXX <br />Deteriorating sidewalk <br />Non-compliant curb rampNon-compliant curb ramp