My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Safe Roads to School Kennedy School - DLZ Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Proposals - Safe Roads to School Kennedy School - DLZ Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2023 1:15:46 PM
Creation date
2/14/2023 1:15:37 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Safe Routes to School | 9 <br />APR <br />2023 NOTICE TO PROCEED <br />FIELD VERIFICATION <br />STAGE 3 PLANS (95%) <br />TOPOGRAPHIC SURVEY <br />FINAL TRACINGS <br />PRELIMINARY FIELD <br />CHECK PLANS <br />LETTING <br />ENVIRONMENTAL <br />DOCUMENT APPROVED <br />JUN <br />2023 <br />NOV <br />2024 <br />JUL <br />2023 <br />MAR <br />2024 <br />OCT <br />2023 <br />JULY <br />2025 <br />AUG <br />2024 <br />Schedule <br />INDOT/LPA PROJECT DEVELOPMENT PROCESS <br />It is our understanding, this project is to have a 2026 fiscal year construction date, which is reflected in <br />the schedule to the right. DLZ is committed to exceeding the schedule expectations, and we are ready <br />to accelerate the schedule should funding become available for an earlier letting. <br />During the first 90 days after being given Notice to Proceed, the DLZ Team will get started with <br />the following tasks: <br />• Conduct a project kickoff meeting with the City to establish project goals, define more specific <br />areas of focus, and confirm our lines of communication. <br />• Once the project Area has been condensed, field verify sidewalks and curb ramps for ADA <br />compliance and determine topographic survey needs. <br />• Complete field visits for documenting environmental resources, if necessary. <br />• Perform topographic survey, verify existing right of way, and initiate any property surveys as <br />required. <br />• Initiate Early Coordination with State and Federal environmental resources. <br />• Initiate coordination with all utilities to verify locations of electrical, natural gas, water, and <br />sanitary sewer lines in the vicinity of the project. <br />ACTION PLAN FOR FIRST 90 DAYS <br />*Schedule assumes no right of way <br />acquisition is required. <br />Right of Way <br />Based upon our preliminary research of the GIS property lines, it generally appears that the <br />construction can be limited to stay within the existing right of way. However, DLZ’s experience <br />has shown that in some instances, areas around curb ramps may require additional right of way <br />to meet ADA requirements. Additionally, federal funding requires that appropriate documentation <br />of right of way be on record. As such, DLZ will perform title research to confirm the existing right <br />of way. If there are areas of insufficient documentation, or where additional right of way may be <br />needed to construct the desired improvements, our team will work diligently with INDOT and the <br />City of South Bend to find alternatives to reduce or eliminate the right of way impact. If permanent <br />or temporary right of way is required, the we will be ready to expedite Right of Way Engineering <br />and Acquisition services with your approval.
The URL can be used to link to this page
Your browser does not support the video tag.