Laserfiche WebLink
.~ <br />I <br />Section 5.1.1.1.1. Payment to Engineer for Basic <br />_ Basic Services for One Prime Contract <br />5.1.1.1.1.1. Report Phase $ 1,000 <br />.. ,. 5.1.1.1.1.2. Survey ._. ._ 1,400 <br />5.1.1.1.1.3. Preliminary Design 17,000 <br />5.1.1.1.1.4. Final Design 17,200 <br />5.1.1.1.1.5. Right-of-Way Services 1,800 <br />5.1.1.1..1.6. Bid Phase Services 1,000 <br />5.1.1.1.1.7. Landscape Median Design <br /> (Irrigation Design not Included) 1,200 <br />5.1.1.1.1.8. Permit Applications 300 <br />' Total Fee for Engine ering Services, not including <br />Construction Phase Services $ 40,900 <br />• <br />• Page lla of 19 <br />