Laserfiche WebLink
1.2.3. Identify and analyze requirements df govern- 1.3.3. Advise OWNER if additional data or services <br />mental authorities having jurisdiction to approve the of the types described in paragraph 3.4 are necessary <br />design of the Project and participate in consultations and assist OWNER in obtaining such data and services. <br />with such authorities. <br />~~ <br />C~ <br />2.4. Provide analyses of OWNER's needs, plannin <br />veys, site evaluations and comparative studies <br />o ective sites and solutions. / <br />1.2.5. )vide a general economic analysis o,P~OWN- <br />ER's req rements applicable to various alt natives. <br />1.2.6. Prepa a Report containing sche atic layouts, <br />sketches and c nceptual design criteri with appropri- <br />ate exhibits to in ~ ate clearly the cons' erations involved <br />(including applica le requiremen of governmental <br />authorities having ~ risdiction aforesaid) and the <br />alternative solutions a ailable OWNER and setting <br />forth ENGINEER's find gs a recommendations. This <br />Report will be accompani y ENGINEER'S opinion <br />of probable costs for the P ct, including the following <br />which will be separate] ite 'zed: Construction Cost, <br />allowance for enginee ng costs nd contingencies, and <br />(on the basis of inf rmation fu fished by OWNER) <br />allowances for su other items as harges of all other <br />professionals an consultants, for th cost of land and <br />rights-of--way, or compensation for r damages to <br />properties, f interest and financing c rges and for <br />other serv' es to be provided by other for Owner <br />pursuant paragraphs 3.7 through 3.11, inc slue. The <br />total of 11 such costs, allowances, etc. are he einafter ~' <br />calle `Total Project Costs". <br />7. Furnish five copies of the Study and Report c <br />:nts and review them in person with OWNER. <br />The duties and responsibilities of ENGINEER during <br />the Study and Report. Phase are amended and supple- <br />mented as indicated in paragraph 2 of Exhibit A "Fur- <br />ther Descriptions of Basic Engineering Services and <br />Related Matters". <br />1.3. Preliminary Design Phase. -- <br />After written authorization to proceed with the Prelim- <br />inary Design Phase, ENGINEER shall: <br />1.3.1. In consultation with OWNER and on the basis <br />of the accepted Study and Report documents, deter- <br />mine the general scope, extent and character of the <br />Project. <br />].3.2. Prepare Preliminary Design documents consist- <br />ing offinaldesign criteria, preliminary drawings, outline <br />specifications and. written descriptions of the Project. <br />1.3.4. Based on the information contained in the pre- <br />liminary design documents, submit a revised opinion <br />of probable Total Project Costs. <br />1.3.5. Furnish five copies of the above Preliminary <br />Design documents and present and review them in per- <br />son with OWNER. <br />The duties and responsibilities of ENGINEER during <br />the Preliminary Design Phase are amended and sup- <br />plemented as indicated in paragraph 3 of Exhibit A <br />"Further Description of .Basic Engineering Services <br />and Related Matters". <br />1.4. Final Design Phase. <br />After written authorization io proceed with the Final <br />Design Phase, ENGINEER shall: <br />1.4.I. On the basis of the accepted Preliminary Design <br />documents and the revised opinion of probable Total <br />Project Costs prepare for incorporation in the Contract <br />Documents final drawings to show the general scope, <br />extent and character of the work to be furnished and <br />performed by Contractor(s) (hereinafter called "Draw- <br />ings") and Specifications (which will be prepared in <br />conformance with. the sixteen division format of the <br />Construction Specifications Institute). <br />1.4.2. Provide technical criteria, written descriptions <br />and design data for OWNER's use in filing applications <br />for permits with or obtaining approvals of such gov- <br />ernmental authorities as have jurisdiction to approve <br />the design of the Project, and assist OWNER in con- <br />sultations with appropriate authorities. <br />1.4.3. Advise OWNER of any adjustments to the latest <br />opinion of probable Total Project Costs caused by <br />changes in general scope, extent or character or design <br />requirements of the Project or Construction Costs. Fur- <br />nish to OWNER a revised opinion of probable Total <br />Project Costs based on the Drawings and Specifica- <br />tions. <br />1.4.4. Prepare for review and approval by OWNER, <br />its legal counsel and other advisors contract agreement <br />forms, general conditions and supplementary condi- <br />bons, and (where appropriate) bid forms, invitations to <br />bid and instructions to bidders (all of which shall be <br />consistent with the forms and pertinent guide sheets <br />Page 2 of 19 pages <br />