Laserfiche WebLink
K~ <br />M. a- <br /> <br />C. Limitations of Authority <br />Resident Project Representative: <br />1. Shall not authorize any deviation from the Contract Documents or substitution of materials or equipment, <br />unless authorized by ENGINEER. <br />2. Shall not exceed limitations of ENGINEER'S authority as set forth in the Agreement or the Contract <br />Documents. <br />3. `Shall -not undertake any of the responsibilities"of'CONTRfTCTOR, subcontractors or CONTRACTOR'S <br />superintendent. <br />4. Shall not advise on, issue directions relative to or assume control over any aspect of the means, methods, <br />techniques, sequences or procedures of construction unless such advice or directions are specifically <br />required by the Contract Documents. <br />5. Shall not advise on, issue directions regarding or assume control over safety precautions and programs in <br />connection with the Work. <br />6. Shall not accept Shop Drawing or sample submittals from anyone other than CONTRACTOR. <br />7. Shall not authorize OWNER to occupy the Project in whole or in part. <br />8. Shall not participate in specialized field or laboratory tests or inspections conducted by others except as <br />specifically authorized by ENGINEER. <br /> <br />r~ <br />fL <br />x <br />3 of 3 "g" <br />