Laserfiche WebLink
%~ <br />w <br />EXHIBIT A <br />FURTHER DESCRIPTION OF BASIC ENGINEERING SERVICES AND RELATED MATTERS <br />.. Section 6 .._ . ,.._.. . <br />It is recognized and agreed that ENGINEER does .not control. the time of <br />service during the Construction Phase and that such service is <br />dependent upon the Contractor's prosecution of the work. Any estimate <br />for the ENGINEER'S service during construction is based upon. the <br />ENGINEER's best judgement. The actual services to be performed during <br />the construction phase shall be adjusted to conform to the Contractor's <br />schedule. <br />Section 7 <br />Prepare operation and maintenance manuals .for the operation of sanitary <br />sewer lift station(s) and water booster pump(s), as may be included in <br />the project. <br /> <br /> <br />5of5 <br />