Laserfiche WebLink
c,' <br />EXHIBIT A TO AGKEEMENT BETWEEN OWNER AND <br />ENGINEER FOR PROFESSIONAL SERVICES, dated <br />19_ (for use ~~~ith No. 1910-1. 1984 Edition). <br />Further Description of Basic Engineering Services and Related Matters <br />-I : This is an exhibit attached to, made apart of and incarpot~ated by reference into the Agreement made on . , .. <br />19 between Ci t,y of South Bend , Board of Public Works (OWNER) and <br />(ENGINEER) providing for professional engineering services. The Basic Services of Engineer as described in <br />Section 1 of the Agreement are amended or supplemented as indicated below and the time periods for the performance <br />of certain services as indicated in Section 4 of the Agreement are stipulated as indicated below. <br />2. During the Study and Report Phase ENGINEER shall: <br />(insert amendments or supplements to paragraph 1.2.) <br />The Study and Report Phase Services will be completed and the Report submitted within 15 calendar <br />days following written authorization fromOWNER to ENGINEER to proceed with that phase of services. <br />3. During the Preliminary Design Phase ENGINEER shall: <br />(insert amendments or supplements to paragraph 1.3.) <br />The Preliminary Design Phase Services will be completed and ENGINEER'S documentation and opinion of costs <br />submitted within 45 calendar days following written authorization from OWNER to ENGINEER to <br />proceed with that phase of services. <br />4. During the Final Design Phase ENGINEER shall: <br />(insert amendments or supplements to paragraph 1.4.) <br />• The Final Design Phase Services will be completed and Contract Documents and ENGINEER's opinion of costs <br />submitted within 60 calendar days following written authorization from OWNER to ENGINEER to <br />proceed with that phase of services. <br />[If the construction work is to be performed under more than one prime contract and the times of performance are <br />to be staggered, the provisions of paragraph 4.12 will probably apply and it will be necessary to prepare a special <br />schedule for the Final Design Phase Services.] <br />5. During the Bidding or Negotiating Phase ENGINEER shall: <br />Pl~~rT~l4?I~~ii~~ii~'4~t~'t~ ~t~S~a~~~?`~) <br />[If the construction work is to be performed under more than one prime contract and the times of performance are <br />to be staggered, the provisions of paragraph 4.12 will probably apply and it will be necessary to prepare a special <br />schedule for the Bidding or Negotiating Phase Services.] <br />6. During the Construction Phase ENGINEER shall: <br />(insert amendments or supplements to paragraph 1.6.) <br />[If the construction work is to be performed under more than one prime contract and the times of performance are <br />to be staggered, the provisions of paragraph 4.12 will probably apply and it will be necessary to prepare a special <br />schedule for the Construction Phase Services.] <br />[If an outside date for completion of construction is to be added, it should be added here.] <br />Note: This change has to be coordinated with those in ! T4.1 and 4.7. <br />7. During the Operational Phase ENGINEER shall: <br />• 4iR~xkR~gi~>~~ok~c~xacsa~tc~as~txC~~d~~x~gt-x>~btXXb9 <br />[If an outside date for completion of all services is to be added, it should be added here.) <br />Note: This change is to be coordinated with those in T!4.1 and 4.R. <br />v" 1 0 f 5 <br />