SECTION 6-CONSTRUCTION COST AND <br />OPINIONS OF COST <br />6.1. Construction Cost. <br />The construction cost of the entire Project (hereirrreferred <br />to as "Construction Cost") means the total cost to <br />OWNER of those portions of the entire Project designed <br />and specified by ENGINEER, but it will not include <br />ENGINEER'S compensation and expenses, the cost of <br />land, rights-of--way, or compensation for or damages <br />to, properties unless this Agreement so specifies, nor <br />will it include OWNER'S legal, accounting, insurance <br />counseling or auditing services, or interest and financ- <br />ing charges incurred in connection with the Project or <br />the cost of other services to be provided by others to <br />OWNER pursuant to paragraphs 3.7 throughh 3.11, <br />inclusive. [Construction Cost is one of the items com- <br />prising Total Project Costs which is defined in para- <br />graph 1.2.5.) <br />6.2. Opinions of Cost. <br />6.2.1. Since ENGINEER has no control over the cost <br />of labor, materials, equipment or services furnished by <br />others, or over the Contractor(s)' methods of deter- <br />mining prices, or over competitive bidding or market <br />conditions, ENGINEER'S opinions of probable Total <br />Project Costs and Construction Cost provided for herein <br />are to be made on the basis ofENGINEER's experience <br />and qualifications and represent ENGINEER'S best <br />judgment as an experienced and qualified professional <br />engineer, familiar with the construction industry; but <br />ENGINEER cannot and does not guarantee that pro- <br />posals, bids or actual Total Project or Construction <br />Costs will not vary from opinions of probable cost <br />prepared by ENGINEER. If prior to the Bidding or <br />Negotiating Phase OWNER wishes greater assurance <br />as to Total Project or Construction Costs, OWNER <br />shall employ an independent cost estimator as provided <br />in paragraph 3.9. <br />6.2.2. If a Construction Cost limit is established by <br />written agreement between OWNER and ENGINEER <br />and specifically set forth in this Agreement as a -con- <br />dition thereto, the following will apply: <br />6.2.2.1. The acceptance by OWNER at any time <br />during the Basic Services of a revised opinion of <br />probable Total Project or Construction Costs in excess <br />of the then established cost limit will constitute a <br />corresponding revision in the Construction Cost limit <br />to the extent indicated in such revised opinion. <br />6.2.2,2. Any Construction Cost limit so estab- <br />lishedwill include a contingency of ten percent unless <br />another amount is agreed upon in writing. <br />6.2.2.3. ENGINEER will be permitted to deter- <br />mine what types of materials, equipment and com- <br />ponent systems are to be included in the Drawings <br />and Specifications and to make reasonable adjust- <br />ments in the general scope, extent and character of <br />the Project to bring it within the cost limit. <br />6.2.2.4. If the Bidding or Negotiating Phase has <br />not commenced within six months after completion <br />of the Final Design Phase, the established Construc- <br />tion Cost limit will not be binding on ENGINEER, <br />and OWNER shall consent to an adjustment in such <br />cost limit commensurate with any applicable change <br />in the general level of prices in the construction indus- <br />try between. the date of completion of the Final Design <br />Phase and the date on which proposals or bids are <br />sought. <br />6.2.2.5. If the lowest bona fide proposal or bid <br />exceeds the established Construction Cost limit, <br />OWNER shall (1) give written approval to increase <br />such cost limit, (2) authorize negotiating or rebidding <br />the Project within a reasonable time, or (3) cooperate <br />in revising the Project's general scope, extent or <br />character to the extent consistent with the Project's <br />requirements and with sound engineering practices. <br />In the case of (3), ENGINEER shall modify the Con- <br />tract Documents as necessary to bring the Construc- <br />tion Cost within the cost- limit. In lieu of other com- <br />pensation for services in making such modifications, <br />OWNER shall pay ENGINEER, ENGINEER'S cost <br />of such services, all overhead expenses reasonably <br />related thereto and Reimbursable Expenses, but <br />without profit to ENGINEER on account of such <br />services. The providing of such service will be the <br />limit of ENGINEER'S responsibility in this regard. <br />and, having done so, ENGINEER shall be entitled <br />to payment for services in accordance with this <br />Agreement and will not otherwise be liable for dam- <br />ages attributable to the lowest bona fide proposa] or <br />bid exceeding the established Construction Cost. <br />SECTION 7-GENERAL CONSIDERATION <br />7.1. Termination. <br />The obligation to provide further services under this <br />Agreement may be terminated by either party upon <br />thirty days' written notice in the event of substantial <br />Page 15 of ~_ pages <br />