Laserfiche WebLink
.,. <br />. Section 5.1.1.1.1. . Payment to Engineer for Basic <br /> Basic Services for One Prime Contract <br />5.1.1.1.1.1. Report Phase $ 1,000 <br />5.1.1.1.1.2. Survey.., 2,500 <br />5.1.1.1.1.3. Preliminary Design 33,400 <br />5.1.1.1.1.4 . Final Design 34,000 <br />5.1.1.1.1.5. Right-of-Way Services 2,000 <br />5.1.1.1.1.6. Bid Phase Services 1,000 <br />5.1.1.1.1.7. Landscape Median Design <br /> (Irrigation Design not Included) 2,300 <br />5.1.1.1.1.8. Permit Applications 300 <br />Total Fee for Engine ering Services, not including <br />Construction Phase Services ~ 76,500 <br /> <br />Page lla of 19 <br />