My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1991-04-10 Resolution 39
sbend
>
Public
>
Redevelopment Authority
>
Resolutions
>
1990-1999
>
1991
>
1991-04-10 Resolution 39
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 3:06:13 PM
Creation date
7/18/2008 3:06:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~, <br /> <br />1.2.3. Identify and analyze requirements of govern- <br />mental authorities having jurisdiction to approve the <br />design of the Project and participate in consultations <br />with such authorities. <br />.2.4. Provide analyses of OWNER's needs, plannin <br />s veys, site evaluations and comparative studies f <br />pro • ective sites and solutions. <br />1.2.5. rovide a general economic analysis. OWN- <br />ER's req irements applicable to various alt rnatives. <br />1.2.6. Prepa a Report. containing sche atic layouts, <br />sketches and nceptual design criter' with appropri- <br />ateexhibits to in 'ate clearly the cons' erations involved <br />(including applica le requireme of governmental <br />authorities having ~ risdiction s aforesaid) and the <br />alternative solutions ailable o OWNER and setting <br />forth ENGINEER's find gs d recommendations. This <br />Report will be accompani by ENGINEER's opinion <br />of probable costs for the P o ct, including the following <br />which will be separate item' ed: Construction Cost, <br />allowance for engine ing costs. nd contingencies, and <br />(on the basis of i ormation fu fished by OWNER) <br />allowances fors h other items as hai-ges of all other <br />professionals a d consultants, for th cost of land and <br />rights-of--way for. compensation for r damages to <br />properties, or interest and financing ch rges and for <br />other ser ices to be provided by others or Owner <br />pursua xo paragraphs 3.7 through 3.11, incl five. The <br />total all such costs, allowances, etc. are he inafter <br />ca]] d °`Total Project Costs". <br />X.2.7. Furnish five copies of the Study and Report ~ <br />umeYits and review them in person with OWNER. <br />The duties .and responsibilities of ENGINEER during <br />the Study and Report Phase are amended and supple- <br />mented as indicated in paragraph 2 of Exhibit A "Fur- <br />ther Descriptions of Basic Engineering Services and <br />Related Matters". <br />1.3. Preliminary Design Phase. <br />G~ <br />After written authorization to proceed with the Prelim- <br />inary Design Phase, ENGINEER shall: <br />1.3.1. In consultation with OWNER and on the basis <br />of the accepted Study and Report documents, deter- <br />mine the general scope, extent and character of the <br />Project. <br />1.3.2. Prepare Preliminary Design documents consist- <br />ing offinal design criteria, preliminary drawings, outline <br />specifications and written descriptions of the Project. <br />1.3.3. Advise OWNER if additional data or services <br />of the types described in paragraph 3.4 are. necessary <br />and assist OWNER in obtaining such data and services. <br />1.3.4.. Based oq the information contained in the pre- <br />liminary design documents, submit a revised opinion <br />of probable Total Project Costs. <br />1.3.5. Furnish five copies of the above. Preliminary <br />Design documents and present and review them in per- <br />son with OWNER. <br />The duties and responsibilities of ENGINEER during <br />the Preliminary Design Phase are amended and sup- <br />plemented as indicated in paragraph 3 of Exhibit A <br />"Further Description of Basic Engineering Services <br />and Related Matters". <br />1.4. Final Design Phase. <br />After written authorization to proceed with the Final <br />Design Phase, .ENGINEER shall: <br />1.4. I. On the basis of the accepted Preliminary Design <br />documents and the revised opinion of probable Total <br />Project Costs prepare for incorporation in the Contract <br />Documents final drawings to show the general scope, <br />extent and character of the work to be furnished and <br />performed by Contractor(s) (hereinafter called "Draw- <br />ings") and Specifications (which will be prepared in <br />conformance with the sixteen division format of the <br />Construction Specifications Institute). <br />1.4.2. Provide technical criteria, written descriptions <br />and design data for OWNER's use in filing applications <br />for permits with or obtaining approvals of such gov- <br />ernmental authorities as have jurisdiction to approve <br />the design of the Project, and assist OWNER in con- <br />sultations with appropriate authorities. <br />] .4.3. Advise OWNER of any adjustments to the latest <br />opinion of probable Total Project Costs caused by <br />changes in general scope, extent or character or design <br />requirements of the Project or Construction Costs. Fur- <br />nish to OWNER a revised opinion of probable Total <br />Project Costs based on the Drawings and Specifica- <br />tions. <br />].4.4. Prepare for review and approval by OWNER, <br />its legal counsel and other advisors contract agreement <br />forms, general conditions and supplementary condi- <br />tions, and (where appropriate) bid forms, invitations to <br />bid and instructions to bidders (all of which shall be <br />consistent with the forms .and pertinent guide sheets <br />Page 2 of ~,.y_ pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.