Laserfiche WebLink
,' <br />~~ _ <br />t <br /> <br /> <br />--_ <br />2.2.2 Prepare a final conceptual land use plan for the project <br />area, incorporating the .information developed :in the <br />preliminary meetings and "brainstorming" sessions in <br />Paragraph 2:1. <br />2.2.3 Prepare a Transportation Analysis including: <br />a. Travel forecasting, including trip generation, trip <br />.distribution and traffic assignment. <br />b. Collect .most recent traffic counts on existing <br />major thoroughfares in project area, <br />c. Develop traffic projections. <br />2.2.4 Prepare Preliminary Transportation System Improvements <br />including: <br />a. Minimum design criteria and locations for the <br />proposed improvements such as new .roadways, <br />intersections, interchanges, traffic control <br />devices, etc. <br />b. Determine extent of land acquisition required for <br />proposed transportation improvements. <br />c. Preliminary ;earthwork and grading estimates. <br />2.2,5 Prepare a Preliminary Drainage System Analysis including: <br />a. Divide the project area into drainage sub-areas <br />utilizing existing topography maps and USGS <br />topography maps. <br />b. Establish storm drainage design criteria. <br />c. Select potential locations and preliminary size for <br />drainage system facilities such as <br />retention/detention basins, trunk lines, etc. <br />2.2.6 Prepare a Preliminary Sewer and Water System Analysis <br />including:; <br />a. Develop sanitary sewer and water demand criteria. <br />based on the preliminary land use plans. <br />b. Review existing utility system facilities within or <br />adjacent to the project area. <br />c. Develop a conceptual utility plan to serve the <br />proposed land uses. <br />2.2.7 Prepare a preliminary statement of probable construction <br />-- - --~fls-t-s-fo~r the-v-a-r-i~a-s--~rro~o~e~-~-mp-rov~r~e-rats . - --- <br />-2- <br />