Laserfiche WebLink
EXHI(31'1' A'l~O AC;KIEAIEN"l~ 13Ii"1'Wh;GN OWNt:R ANI) <br />L-:NGINEER FOR PROFESSIONAL Sl.RVICES, dated <br />19_ (fur use with No. 191(1-1, 1984 Edition). <br />Further Description of Basic Engineering Services and Related Matters <br />1. This is an exhibit attached to, made a part of and inco orated by reference into the Agreement made on - , - <br />19 between C1 ty of South Bend, Board of Publ i C Works (OWNER) and <br />(ENGINEER) providing for professional engineering services. The Basic Services of Engineer as described in <br />Section 1 of the Agreement are amended or supplemented as indicated below and the time periods for the performance <br />of certain services as indicated in Section 4 of the Agreement are stipulated as indicated below. <br />2. During the Study and Report Phase ENGINEER shall: <br />K~axoa~~~s;>axxoc~i~eta>~~axp~t~xg~}aiaxix~ <br />The Study and Report Phase Services will be completed and the Report submitted within 15 calendar <br />days following ?,vritten authorization from OWNER to ENGINEER to proceed with that phase of services. <br />3. During the Preliminary Design Phase ENGINEER shall: <br />(insert amendments or supplements to paragraph 1.3.) <br />The Preliminary Desi n Phase Services will be completed and ENGINEER's documentation and opinion of costs <br />submitted within 4~ calendar days following written authorization from OWNER to ENGINEER to <br />proceed with that phase of services. <br />4. During the Final Design Phase ENGINEER shall: <br />(insert amendments or supplements to paragraph 1.4.) <br />The Final Design. Phase Services will be completed and Contract Documents and ENGINEER's opinion of costs <br />submitted within 6~ calendar days following written authorization from OWNER to ENGINEER to <br />proceed with that phase of services. <br />[If the construction work is to be performed under more than one prime contract and the times of performance are <br />to be staggered, the provisions of paragraph 4.12 will probably apply and it will be necessary to prepare a special <br />schedule for the Final Design Phase Services.] <br />5. During the Bidding or Negotiating Phase ENGINEER shall: <br />-~t~P:Li!C >~~~C A 4~4t'~i4 ~c9cn(~i~D}~iF~14C9~R ~ ~t)Pt';~p(}X ~ X`x ) <br />[If the construction work is to be performed under more than one prime contract and the times of performance are <br />to be staggered, the provisions of paragraph 4.12 will probably apply and it will be necessary to prepare a special <br />schedule for the Bidding or Negotiating Phase Services.] <br />6. During the Construction Phase ENGINEER shall: <br />(insert amendments or supplements to paragraph 1.6.) <br />{If the construction work is tote performed under more than one prime contract and the times of performance are <br />to be staggered, the provisions of paragraph 4.12 will probably apply and it will be necessary to prepare a special <br />schedule for the Construction Phase Services.) <br />jIf an outside date for completion of construction is to be added, it should be added here.] <br />Note : This change has to be coordinated with those in ~~4.1 and 4.7. <br />7. During the Operational Phase ENGINEER shall: <br />Nas(xr<xaa~etadvn7e~a;~x~awcs~txs~x~t~x~>%~~~4 <br />~ lf' an outside date for completion of all services is to be added, it should be added here.] <br />Nntr~: This change is to he coordinated with those in x''4.1 and 4.K. <br />vu <br />1 of 5 <br />