Laserfiche WebLink
LJ <br />Section 5.1.1.1.1. Payment to Engineer far Basic <br /> Basic Services for Une Prime Contract <br />5.1.1.1.1.1. Report Phase ~ 2,500 <br />5.1.1.1.1.2. Survey 8,650 <br />5.1.1.1.1.3. Preliminary Design 43,000 <br />- 5.1.1.1.1.4. final Design 84,000. <br />5.1..1.1.1.5. Right-of-Way Services .2,250 <br />5.1.1.1.1.6. Bid Phase Services 3,000 <br />5.1.1.1.1.7. Utility Agreements 750 <br />5.1.1.1.1.8. Permit Applications 500 <br />Total Fee for Engineering Services, not including <br />Construction Phase. Services. $144,650 <br />• <br />Page lla of 19 <br />(14 of 19) <br />