My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1991-04-10 Resolution 39
sbend
>
Public
>
Redevelopment Authority
>
Resolutions
>
1990-1999
>
1991
>
1991-04-10 Resolution 39
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 3:06:13 PM
Creation date
7/18/2008 3:06:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />l-J <br /> <br />ilicatiuns or chanties in the general sco{~e, extent ur <br />character of the Project desired by OWNIiR, and upon <br />written authorization from OWNER. ENGINEER shall <br />proceed with the performance of the services called fur <br />in the Preliminary Design Phase, and shall submit pre- <br />liminary design documents and a revised opinion of <br />probable Total Project Costs within the stipulated period <br />indicated in paragraph 3 of Exhibit A "Further Descrip- <br />tion of Basic Engineering Services and Related Mat- <br />ters". <br />4.4. After acceptance by OWNER of the Preliminary <br />Design Phase documents and revised opinion of prob- <br />able Total Project Costs, indicating any specific mod- <br />ifications or changes in the general scope, extent or <br />character of the Project desired by OWNER, and upon <br />written authorization from OWNER, ENGINEER shall <br />proceed with the performance of the services called for <br />in the Final Design Phase; and shall deliver Contract <br />Documents and a revised opinion of probable Total <br />Project Costs for all work of Contractor(s) on the Proj- <br />ect within the stipulated period indicated in paragraph <br />4 of Exhibit A "Further Description of Basic Engi- <br />•neering Services and Related Matters". <br />4.5. ENGINEER's services under the Study and Report <br />Phase, Preliminary Design Phase and Final Design Phase <br />shall each be considered complete at the earlier of (1) <br />the date when the submissions for that phase have been <br />accepted by OWNER or (2) thirty days after the date <br />when such submissions are delivered to OWNER for <br />final acceptance, plus in each case such additional time <br />as may be considered reasonable for obtaining approval <br />of governmental authorities having jurisdiction to <br />approve the design of the Project. <br />4.6. After acceptance by OWNER of the ENGI- <br />NEER'sDrawings, Specifications and other Final Design <br />Phase documentation including the most recent opinion <br />of probable Total Project Costs and upon written autho- <br />rization to proceed, ENGINEER shalt proceed with <br />performance of the services called for in the Bidding <br />or Negotiating Phase. This Phase shall terminate and <br />the services to be rendered thereunder shall be consid- <br />ered complete upon commencement of the Construc- <br />tion Phase or upon cessation of negotiations with pro- <br />spective Contractor(s) (except as may otherwise be <br />required to complete the services called for in para- <br />graph 6.'_.?.5). <br />4.7. The Construction Phase ~+~ill commence with the <br />execution of the first prime contract to he executed for <br />the work oC the Project or any part thereof, and will <br />terminate upon written recommendation by ENGI- <br />NII;R of final pad mcnt un the last prime contract to <br />he completed. Construction Phase services maybe ren- <br />dered at different times in respect of separate prime <br />cunU•acts if the Project involves more than one prime <br />contract. <br />4,8. The Operational Phase will commence during the <br />Construction Phase and .will terminate one year after <br />the date. of Substantial Completion of the last prime <br />contract for construction, materials and equipment on <br />which substantial completion is achieved. <br />4.9. If OWNER has requested significant modifications <br />or changes in the general scope, extent or character of <br />the Project, the time of performance of ENGINEER'S <br />services shall be adjusted equitably. <br />4.10. If OWNER fails to give prompt written authori- <br />zation toproceed with any phase of services after com- <br />pletion of the immediately preceding phase, or if the <br />Construction Phase has not commenced within 360 <br />calendar days (plus such additional time as may be <br />required to complete the services called for under para- <br />graph 6.2.2.5) after completion of the Final Design Phase, <br />ENGINEER may, after giving seven days' written notice <br />to OWNER, suspend services under this Agreement. <br />4.11. If ENGINEER'S services for design or during <br />construction of the Project are delayed or suspended <br />in whole or in part by OWNER for more than three <br />months for reasons beyond ENGINEER's control, <br />ENGINEER sha'_.1 on written demand to OWNER (but <br />without termination of this Agreement} be paid as pro- <br />vided in paragraph 5.3.2. If such delay or suspension <br />extends for more than one year for reasons beyond <br />ENGINEER's control, or if ENGINEER for any rea- <br />son is required to render Construction Phase services <br />in respect of any prime contract for construction, mate- <br />rials orequipment more than one year after Substantial <br />Completion is achieved under that contract, the various <br />rates of compensation provided for elsewhere in this <br />Agreement shall be subject to equitable adjustment. <br />4.J2. In the event that the work designed or specified <br />by ENGINEER is to be furnished or performed under <br />more than one prime contract, or if ENGINEER'S ser- <br />vices are to be separately sequenced with the work of <br />one or more prime contractors (such as in the case of <br />fast-tracking), O~~~NER and ENGINEER shall, prior <br />to commencemen; of the Final Design Phase, develop <br />a schedule for performance of ENGINEER'S services <br />during the Final I?e,ign, Bidding or Negotiating and <br />Construction Phase, in order to sequence and coordi- <br />nate properly suc!~, Services as are applicable to the <br />++ork under such ~.parate ronuacts. This schedule is <br />P:~~:~ y ~,r ~~ r.~~:~, <br />
The URL can be used to link to this page
Your browser does not support the video tag.