Laserfiche WebLink
<br /> <br />APPEHDIX_"F" <br />AIRPORT 2010 PROJECT - AIRPORT ECONOMIC DEVELOPMENT AREA: <br />ENGINEERING SERVICES FOR DESIGN OF OLD CLEVELAND. ROAD REALIGNMENT <br />FROM MAYFLOWER ROAD EAST TO OLD CLEVELAND ROAD, WEST OF BENDIX DRIVE <br />SCHEDULE (ONLY VALID IF ALL PHASES AWARDED IN SEQUENCE AND IN TIMELY MANNER) <br />The engineering services described in Part I (A thru N) above shall be <br />performed as much as possible on the following schedule: <br />NOTICE TO PROCEED ±DEC. 26, 1990 <br />COMPLETION OF SURVEY JAN. 28, 1991 <br />BEGIN DESIGN JAN. 2, 1991 <br />PRELIMINARY DRAINAGE PLAN JAN. 28, 1991 <br />' GRADE REVIEW PLANS COMPLETE ~ FEB. 25, 1991 <br />FINAL DRAINAGE PLAN MAR. 18, 1991 <br />PRELIMINARY FIELD CHECK PLANS APR. 8, 1991 <br />FIELD CHECK PLANS APR. 22, 1991 <br />FIELD CHECK (Weather Permitting) APR. 25, 1991 <br />FINAL CHECK PRINTS MAY 6, 1991 <br />FINAL. DOCUMENTS TO THE CITY (For Bids) MAY 13, 1991 <br />The above schedule is based on standard reviev times for CITY <br />and .THE DEPARTMENT OF ECONOMIC DEVELOPMENT. The actual <br />schedule may vary depending on actual review times and date of <br />Notice to Proceed. <br />Page 25 <br /> <br />