My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1991-04-10 Resolution 39
sbend
>
Public
>
Redevelopment Authority
>
Resolutions
>
1990-1999
>
1991
>
1991-04-10 Resolution 39
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 3:06:13 PM
Creation date
7/18/2008 3:06:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. Cooperate with the City in conducting any public hearings required <br />for the project and provide all technical support personnel and data <br />necessary for the hearing. <br />8. If inspection services. are required for the construction of this <br />project, those services trill be negotiated separately with the City. <br />SECTION 2. INFORMATION AND SERVICES TO BE FURNISHED BY THE CITY <br />---------- ---------------------------------------------------- <br />The CITY shall furnish the ENGINEER with the following information: <br />A. Traffic Assignments, Traffic Counts, Previous Warrant Studies and <br /> any other pertinent traffic and utility data in the CITY's files. <br />B. All pertinent data from previous or proposed projects in the area of <br /> this project. <br />C. Criteria for design and details for highways and structures such as <br /> grades, curves, sight distances, clearances, design loadings, etc.., <br /> including "Procedures for the Development o~ Structure Plans <br /> (including Roads) for the State," dated Nov. l~, 1964, Revised March <br /> 6, 1965, and Sept. 4, 1965, respectively for roads and bridges, <br />• including the latest rp'visions and a copy of which is on file with <br /> the Indiana Department of Highways incorporated herein by reference <br /> only and is made a part thereof. <br />• l <br />D. Specifications and such draxings of highway, , <br />traffic contro <br /> municipal utilities, and bridge standards as are applicable to the <br /> project. <br />SECTIOH_3. PAYtiEHTS <br />A. The ENGINEER shall receive as payment for the work performed under this <br />Agreement, the lump sum fee of 9149, 860. 00 unless a modification of the <br />Agreement is approved by the CITY in accordance with Sections 3.C and 6. <br />However, any right 'of ENGINEER to payment is dependent upon the <br />fulfillment of the terms of this contract. <br />1. The ENGINEER shall submit invoices to the CITY not more often than <br />_ once per month during the progress of the work, for the partial <br />payment on account for the work completed to date. Such invoices <br />shall represent the values. to the CITY of the partially c;~mpleted <br />work based on the proportion which its percentage of completion <br />bears to the total cost of the fully completed work. <br />2. The CITY, for and in consideration of the rendering of the <br />engineering services herein enumerated, agrees to pay to the <br />ENGINEER for rendering such services the total fee established above <br />• in the following manner: <br />Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.