Laserfiche WebLink
.. ..~ <br />. SECTION 1_1 MORE DETAILED_SCOPE_OF_SERVICES <br />This section of realigned and reconstructed roadway was described in earlier <br />"Airport 2010 Project" reports as "Section 4" (See Exhibit A) and "Section 5" <br />(See Exhibit B). These exhibits also briefly describe the engineering <br />services .to be performed under this contract. <br />A. Survey work shall consist of the folloring: <br />1. Survey approximately 6,930 feet of the proposed roadway centerline <br />from information supplied by CITY, setting iron pipes over iron <br />pipes at all PI's, iron pipes at PC's and PT's, hub and tack at <br />every 500 foot station,. and lath at every 100 foot station. All <br />PI`s mill be referenced outside of the proposed right of way. YJork <br />will conform to "Survey Manual, Location Surveys, Indiana State <br />Highway Commission,".revised June 1985, as the guide. <br />2. Plan and profile a 200 foot wide corridor centered on the agreed <br />centerline. Cross-sections will be taken at 500 foot intervals <br />through the fields along the relocation centerline to save both time <br />and expense. These sections will be compared to the aerial <br />photogrametric maps from Michiana'~Reganal Airport tMRA). If the <br />map contours agree with the 500 foot cross-sections, then th.e <br />remaining cross-sections will be approximated using the MRA maps. <br />If the field data does not agree with the contour maps, additional <br />cross-sections at intervals of 100 feet vill be performed. <br />3. Locate and determine inverts on utilities accessible in the field. <br />4. Survey Old Cleveland Road for 800 feet more.. or less west from the <br />point at which the new alignment becomes tangent with the old. road <br />to alloy the design of an intersection. <br />5. Prepare a plat of dedication for the new portion of the realigned <br />Cleveland Road for CITY to record. <br />6. If the CITY requires additional surveying services over and above <br />those described in 1. thru 5. above tsuch as for the purpose of <br />subdividing and staking the areas adjacent to the realigned Old <br />Cleveland Road), those surveying services will be provided at the <br />rates indicated in Appendix E, Part i, "Field Survey..." attached <br />to this contract. These additional surveying services would be <br />paid for separately and are not included in the costs indicated in <br />this contract. <br />Page 4 <br />