Laserfiche WebLink
S ~~ <br />PROJECT: REALIGN OLD CLEVELAND ROAD FROM MAYFLOWER ROAD TO THE <br />INDUSTRIAL PARK, South Bend; Indiana _. <br />DESCRIPTION: DESIGN ENGINEERING: INCLUDING ROADWAY SURVEYING, WATER, <br />SANITARY SEWER, STORM DRAINAGE AND STORM WATER MANAGEMENT. <br />Estimate of Construction_Cost_ 53,042,000.00 (in 1990 S's) <br />------- -- ----------- -- - <br />COSTS OBLIGATED UNDER THIS CONTRACT <br />1. Field Survey . S 17, 450.00 <br />2. Preliminary Drainage Plan. . S 7, 500.00 <br />3. Grade Reviev Plans.. S 47,.240.00 <br />4. Preliminary Field Check Plans. . . S 14, 210.00 <br />5. .Final Drainage Plan S 6, 500.00 <br />6. Final Field Check Plans. . . • ~ • .y : S 13, 950.00 <br />7. Final Check Prints . . S 13, 040.00 <br />S. Final Documents to CITY. . . .9 29,970.00 <br />TOTAL COST OBLIGATION OF THIS AGREEMENT NOT TO EXCEED S 149,860.00 <br />UNLESS MUTUALLY AGREED UPON AND AFPROVED IH WRITING <br />BY THE CITY. <br />NOW THEREFORE, in consideration of the mutual covenants,, herein contained, <br />the parties hereto mutually covenant and agree as follovs: <br />SECTION 1. ENGINEERING SERVICES <br />A. The ENGINEER agrees to prepare preliminary plans and preliminary <br />estimates of cast, which shall be in accordance with the accepted.. <br />standards for such vork and in accordance vith the applicable current <br />Standard Specifications of the City of South Bend, Indiana, except as <br />modified by special provisions and .supplemental specifications, if any, <br />and vhich shall be accurate and complete as required as a basis for the <br />making of contract plans for the proposed project and shall be completed <br />as scheduled under Section 1., E. of this agreement. <br />Page 2 <br />