• <br />EXHIBIT A TO AGREEMENT BETWEEN OWNER AND <br />ENGINEER FOR PROFESSIONAL SERVICES, dated <br />• 19- (for use with No. 1910-1, 1984. Edition). <br />Further Description of Basic Engineering Services and Related Matters <br />- 1. -'This is an exhibit attached to; made a part of and incorporated by reference into the Agreement made on _ , ~j <br />19 between ('i try of South Bend Board of Public Works _ (OWNER) and <br />(ENGINEER) providing for professional engineering services. The Basic Services of Engineer as described in <br />Section 1 of the Agreement are amended or supplemented as indicated below and the time periods for the performance <br />of certain services as indicated in Section 4 of the Agreement are stipulated as indicated below. <br />2. During the Study and Report Phase ENGINEER shall: <br />(insert amendments or supplements to paragraph 1.2.) <br />The Study and Report Phase Services will be completed and the Report submitted within 15 calendar <br />days following written authorization from OWNER to ENGINEER to proceed with that phase of services. <br />3. During the Preliminary Design Phase ENGINEER shall: <br />(insert amendments or supplements to paragraph 1.3.) <br />The Preliminary Design Phase Services will be completed and ENGINEER'S documentation and opinion of costs <br />submitted within 45 calendar days following written authorization from OWNER to ENGINEER to <br />proceed with that phase of services. <br />4. During the Final Design Phase ENGINEER shall: <br />(insert amendments or supplements to paragraph 1.4.) <br />. The Final Design Phase Services will be completed and Contract Documents and ENGINEER's opinion of costs <br />submitted within 60 calendar days following written authorization from OWNER to ENGINEER to <br />proceed with that phase of services. <br />[If the construction work is to be performed under more than one prime contract and the times of performance are <br />to be staggered, the provisions of paragraph 4.12 will probably apply and it will be necessary to prepare a special <br />schedule for the Final Design Phase Services.] <br />5. During the Bidding or Negotiating Phase ENGINEER shall: <br />Harz ~m~9c ~ ~ X34 ~>~ ~Sf Jtt#~a;!S K ~9 X~ ~ <br />[If the construction work is to be performed under more than one prime contract. and the times of performance are <br />to be staggered, the provisions of paragraph 4.12 will probably apply and it will be necessary to prepare a special <br />schedule for the Bidding or Negotiating Phase Services.} <br />6. During the Construction Phase ENGINEER shall: <br />(insert amendments or supplements to paragraph. 1.6.) <br />[If the construction work is to be performed under more than one prime contract and the times of performance are <br />to be staggered, the provisions of paragraph 4.12 will probably apply and it will be necessary to prepare a special <br />schedule for the Construction Phase Services.] <br />[If an outside date for completion of construction is to be added, it should be added here.] <br />Note: This change has to be coordinated with those in ~Ti4.1 and 4.7. <br />7. During the Operational Phase ENGINEER shall: <br />#a1ax~~~~~~d>x~i'.~~~i~sxt~'i~>'4 ~x~x <br />(If an outside date for completion of all services is to be added, it should be added here.] <br />Note: This change is to be coordinated with those in ~T4.1 and 4.8. <br />vii 1 of 5 <br />