My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 2 to OEA - Low-Cost Fincng. for LTCP WWPT CSO 045 – American Structurepoint, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 2 to OEA - Low-Cost Fincng. for LTCP WWPT CSO 045 – American Structurepoint, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2023 1:19:19 PM
Creation date
1/24/2023 1:19:14 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
1/24/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 4 <br />(Exhibit A-1 – Additional Services to be performed by Engineer) <br />D. Deliverables: <br />1. Three hard copies and one electronic copy of the draft PER <br />2. Three hard copies and one electronic copy of the final PER <br />E. Meetings: <br />1. One kickoff meeting with Owner <br />2. One pre-planning meeting with Owner and IFA <br />3. One public hearing <br />4. One review meeting with the Owner <br />F. Schedule <br />The proposed work will be completed within 114 days after receiving the Notice to Proceed (NTP) <br />from the Owner. A breakdown of the preliminary schedule is as follow: <br /> <br />Kickoff meeting with Owner Seven(7) days after NTP <br />Pre-planning meeting with Owner and IFA 30 days after kickoff meeting with Owner <br />Draft PER 60 days after pre-planning meeting <br />Review meeting Seven (7)days after draft PER submittal <br />Final PER and IFA submittal 10 days after review meeting with Owner and <br />IFA comments
The URL can be used to link to this page
Your browser does not support the video tag.