My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Walker Field House Restoration Proj No. 120-010R - Acculevel Commercial Group Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Quotes - Walker Field House Restoration Proj No. 120-010R - Acculevel Commercial Group Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 10:47:51 AM
Creation date
1/24/2023 1:08:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/24/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Health Act, the Lead -Based Paint Poisoning Prevention Act, the Architectural Barriers Act, and <br />Executive Orders and Department of Labor regulations regarding Equal Employment Opportunity. <br />XXI. PLANS <br />A. Prevailing Specifications: City of South Bend Design and Construction Standards <br />B. Additions: <br />1. The plans consist of 4 Sheets. <br />2. Attachments: <br />a. FHWA 1273 Required Contract Provisions, Federal Aid Construction Contracts <br />3. The work shall conform to the plans. <br />4. The drawings are schematic in nature. <br />5. The CONTRACTOR is responsible for estimating dimensions and quantities of materials. <br />6. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall govern. <br />V. M/WBE GOALS <br />A. Prevailing Specifications: City of South Bend Ordinance No. 10761-21, Minority and Women <br />Business Enterprise Inclusion Program Plan <br />B. Additions: <br />1. The M/WBE Goals for Division A are: <br />a. MBE 1.4 %. <br />b. WBE 4.7 %. <br />2. Alternate 1 M/WBE goals are: <br />a. MBE 1.4 %. <br />b. WBE 4.7 %. <br />3. Complete FORMS MBE-1.0 MBE Utilization Plan and WBE-1.0 WBE Utilization Plan, and submit <br />with Bid Proposal <br />4. Complete FORMS MBE-2.0 Evidence of Good Faith Efforts and WBE-2.0 Evidence of Good Faith <br />Efforts and submit with Bid Proposal. <br />5. Complete FORMS MBE-2.1 MBE Contacted and WBE-2.1 WBE Contacted and submit with Bid <br />Proposal. <br />VI. DHPA REQUIREMENTS <br />A. Prevailing Specifications: Secretary of the Interior's Standards and Guidelines for the Rehabilitation of <br />Historic Properties <br />B. Additions: <br />1. Required federal language. The bid documents (and subsequently the contract documents) must <br />include the following language verbatim: <br />a. This project is funded in part by a grant from the U.S. Department of the Interior, National Park <br />Service's Historic Preservation Fund Program and is being administered by the Indiana <br />Department of Natural Resources, Division of Historic Preservation and Archaeology. <br />Compliance with all applicable federal, state, and local laws, rules, and regulations is required. <br />b. Compliance with the applicable Secretary of the Interior's Standards and Guidelines is <br />required. <br />c. The Indiana Department of Natural Resources, the Indiana State Auditor, the U.S. Department <br />Version 9/29/2021 Page - 8 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.