My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - Nexus Center Roof Replacement Proj No. 121-064 - Slatile Roofing & Metal Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Award Bids
>
Award Bid - Nexus Center Roof Replacement Proj No. 121-064 - Slatile Roofing & Metal Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2023 1:55:39 PM
Creation date
1/10/2023 1:55:20 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/10/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 of 1 <br /> <br /> <br /> <br />INTER-OFFICE MEMORANDUM <br /> <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENGINEERING <br />TO: Theresa Heffner, Clerk <br />Board of Public Works <br />FROM: Zach Hurst, Project Engineer <br /> <br />SUBJECT: Award Bid - Project No. 121-064A <br />Nexus Center Roof Replacement <br />DATE: 01/03/2023 <br />On December 10, 2022, the Board of Public Works opened and read bids for the above project. <br /> <br />Three bids in total were received, from Slatile Roofing and Sheet Metal, Dudeck Roofing and <br />Sheet Metal, and Midland Engineering. The bids were reviewed and found complete and <br />responsive. A bid tab follows this page. <br /> <br />Slatile’s base bid of $214,812 is the lowest bid. <br /> <br />MWBE Analysis: <br />MBE goal: 0.6% <br />• Met via JMH Roofing Company: $2,148.12** (1.0%) <br />WBE goal: 2.1% <br />• Met via JMH Roofing Company: $6,444.36** (3.0%) <br /> <br />**Percentages committed to in bid have been carried over to actual contract amount of <br />$214,812. Dollar amounts have been adjusted. <br /> <br />I recommend award of the base bid for Nexus Center Roof Replacement to Slatile Roofing <br />and Sheet Metal Co. Inc., in the amount of $214,812.00. Funding is available through PR- <br />00020455. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.