Laserfiche WebLink
Main Street Improvements Between Sherwood Street and Dean Street / SB # 122-045 <br />Bid Tab <br />Engineer's Estimate <br />Milestone Contractors North <br />Reith Riley Construction Co. <br />ITEM <br />DESCRIPTION OF ITEM <br />ESTIMATED <br />QUANTITY <br />UNIT <br />Unit Price <br />Extension <br />Unit Price <br />Extension <br />Unit Price <br />Extension <br />1 <br />Common Excavation <br />446 <br />CYS <br />$25.00 <br />$11,150.00 <br />$98.00 <br />$43,708.00 <br />$82.87 <br />$36,960.02 <br />2 <br />Concrete, Remove <br />198 <br />SYS <br />$14.00 <br />$2,772.00 <br />$19.00 <br />$3,762.00 <br />$38.10 <br />$7,543.80 <br />3 <br />Subgrade Treatment Type II <br />865 <br />SYS <br />$14.00 <br />$12,110.00 <br />$15.00 <br />$12,975.00 <br />$21.03 <br />$18,190.95 <br />4 <br />Compacted No. 53 Subbase <br />270 <br />TON <br />$29.00 <br />$7,830.00 <br />$44.00 <br />$11,880.00 <br />$61.92 <br />$16,718.40 <br />5 <br />Milling, 1.5 in. <br />3208 <br />SYS <br />$5.00 <br />$16,040.00 <br />$5.20 <br />$16,681.60 <br />$4.04 <br />$12,960.32 <br />6 <br />HMA Surface, PG64-28P, Type B <br />321 <br />TON <br />$115.00 <br />$36,915.00 <br />$174.00 <br />$55,854.00 <br />$145.55 <br />$46,721.55 <br />7 <br />HMA Intermediate, Type B <br />94 <br />TON <br />$115.00 <br />$10,810.00 <br />$187.00 <br />$17,578.00 <br />$309.17 <br />$29,061.98 <br />8 <br />HMA Base, Type B <br />220 <br />TON <br />$130.00 <br />$28,600.00 <br />$130.00 <br />$28,600.00 <br />$190.28 <br />$41,861.60 <br />9 <br />Tack Coat <br />2 <br />TON <br />$500.00 <br />$1,000.00 <br />$1.00 <br />$2.00 <br />$339.14 <br />$678.28 <br />10 <br />Joint Adhesive, Surface <br />1,216 <br />LFT <br />$2.00 <br />$2,432.00 <br />$1.00 <br />$1,216.00 <br />$2.82 <br />$3,429.12 <br />11 <br />PCCP for Approaches, 6 in. <br />23 <br />SYS <br />$82.00 <br />$1,886.00 <br />$181.00 <br />$4,163.00 <br />$158.83 <br />$3,653.09 <br />12 <br />Sidewalk, Concrete <br />28 <br />SYS <br />$108.00 <br />$3,024.00 <br />$133.00 <br />$3,724.00 <br />$121.41 <br />$3,399.48 <br />13 <br />Curb, Concrete <br />766 <br />LFT <br />$48.00 <br />$36,768.00 <br />$41.00 <br />$31,406.00 <br />$98.72 <br />$75,619.52 <br />14 <br />Drywell, 3600 gal. Capacity <br />2 <br />EA <br />$6,289.00 <br />$12,578.00 <br />$11,000.00 <br />$22,000.00 <br />$11,197.49 <br />$22,394.98 <br />15 <br />Curb Ramp, Concrete <br />29 <br />SYS <br />$280.00 <br />$8,120.00 <br />$265.00 <br />$7,685.00 <br />$359.79 <br />$10,433.91 <br />16 <br />Sodding, Nursery <br />434 <br />SYS <br />$9.00 <br />$3,906.00 <br />$34.91 <br />$15,150.94 <br />$19.53 <br />$8,476.02 <br />17 <br />Tree, Remove, 30 in. <br />2 <br />EA <br />$1,700.00 <br />$3,400.00 <br />$1,250.00 <br />$2,500.00 <br />$7,756.73 <br />$15,513.46 <br />18 <br />Tree Planting <br />9 <br />EA <br />$1,700.00 <br />$15,300.00 <br />$648.00 <br />$5,832.00 <br />$1,018.72 <br />$9,168.48 <br />19 <br />Adjust Casting to Grade <br />5 <br />EA <br />$888.00 <br />$4,440.00 <br />$1,520.00 <br />$7,600.00 <br />$723.21 <br />$3,616.05 <br />20 <br />Adjust Water Valve Casting to Grade <br />2 <br />EA <br />$686.00 <br />$1,372.00 <br />$175.00 <br />$350.00 <br />$301.34 <br />$602.68 <br />21 <br />Curb Box, Adjust to Grade <br />9 <br />EA <br />$600.00 <br />$5,400.00 <br />$875.00 <br />$7,875.00 <br />$1,638.42 <br />$14,745.78 <br />22 <br />Fire Hydrant Assembly, Relocate <br />1 <br />EA <br />$1,500.00 <br />$1,500.00 <br />$7,200.00 <br />$7,200.00 <br />$7,186.34 <br />$7,186.34 <br />23 <br />Sheet Sign with Legend 0.080 in. <br />25 <br />SFT <br />$18.00 <br />$450.00 <br />$63.50 <br />$1,587.50 <br />$24.30 <br />$607.50 <br />24 <br />Sheet Sign, Remove <br />3 <br />EA <br />$34.00 <br />$102.00 <br />$158.00 <br />$474.00 <br />$386.91 <br />$1,160.73 <br />25 <br />Line, Thermoplastic, Solid, Yellow, 4 in. <br />1,640 <br />LFT <br />$1.00 <br />$1,640.00 <br />$0.88 <br />$1,443.20 <br />$0.91 <br />$1,492.40 <br />26 <br />Line, Thermoplastic, Solid, White, 4 in. <br />2,208 <br />LFT <br />$1.00 <br />$2,208.00 <br />$0.88 <br />$1,943.04 <br />$0.91 <br />$2,009.28 <br />27 <br />Line, Thermoplastic, Broken, Yellow, 4 in. <br />410 <br />LFT <br />$1.00 <br />$410.00 <br />$0.93 <br />$381.30 <br />$0.96 <br />$393.60 <br />28 <br />Line, Thermoplastic, Dotted, Yellow, 4 IN., 2 FT. Line, 4 FT. Gap <br />30 <br />LFT <br />$2.00 <br />$60.00 <br />$1.66 <br />$49.80 <br />$1.72 <br />$51.60 <br />29 <br />Line, Thermoplastic, Dotted, White, 4 IN., 2 FT. Line, 4 FT. Gap <br />30 <br />LFT <br />$2.50 <br />$75.00 <br />$1.66 <br />$49.80 <br />$1.72 <br />$51.60 <br />30 <br />Pavement Message Marking, Thermoplastic, Lane Indication Arrow <br />4 <br />EA <br />$200.00 <br />$800.00 <br />$165.00 <br />$660.00 <br />$170.65 <br />$682.60 <br />31 <br />Grooving for Pavement Markings <br />3,482 <br />LFT <br />$1.00 <br />$3,482.00 <br />$0.88 <br />$3,064.16 <br />$0.91 <br />$3,168.62 <br />32 <br />Construction Engineering <br />1 <br />LS <br />$7,000.00 <br />$7,000.00 <br />$4,600.00 <br />$4,600.00 <br />$4,654.04 <br />$4,654.04 <br />33 <br />Mobilization and Demobilization <br />1 <br />LS <br />$11,600.00 <br />$11,600.00 <br />$22,000.00 <br />$22,000.00 <br />$22,667.92 <br />$22,667.92 <br />34 <br />Clearing Right of Way <br />1 <br />LS <br />$4,700.00 <br />$4,700.0011 <br />$25,600.00 <br />$25,600.0011 <br />$18,696.65 <br />$18,696.65 <br />35 <br />Maintenance of Traffic <br />1 <br />LS <br />$16,300.00 <br />$16,300.00 <br />$27,754.66 <br />$27,754.66 <br />$24,233.18 <br />$24,233.18 <br />361 <br />Erosion Control <br />1 <br />LS <br />$2,400.001 <br />$2,400.00 <br />$650.001 <br />$2,148.191 <br />$2,148.19 <br />TOTAL BID (Items 1 to 36) <br />$278,580.00 <br />$398,000.00 <br />$470,953.72 <br />Certified y 11/9/2022 <br />Nitin V. Timble PE. LS Date <br />