My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Design Services for Phase III, Wayfinding Signage Program – Jones Petrie Rafinski
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Design Services for Phase III, Wayfinding Signage Program – Jones Petrie Rafinski
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2022 2:29:32 PM
Creation date
12/20/2022 2:29:22 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />AGREEMENT <br />BETWEEN OWNER AND ENGINEER <br />FOR <br />PROFESSIONAL SERVICES <br /> <br /> <br />THIS IS AN AGREEMENT effective as of ____December 20, 2022____ (“Effective Date”) between <br /> <br />Board of Public Works, City of South Bend, Indiana ("Owner") and <br /> <br />Jones Petrie Rafinski ______________________________________________________(“Engineer”). <br /> <br />Owner's Project, of which Engineer's services under this Agreement are a part, is generally identified as <br />follows: <br /> <br />City Project Number 123-013 City of South Bend Wayfinding Signage Program - Phase III __(“Project"). <br /> <br />Engineer’s Services under this Agreement are generally identified as follows: <br /> <br />Prepare plans and special provisions for next phase of wayfinding signage. JPR assumes that Phase 3 will <br />also include approximately 24 signs. Work for this phase shall include any necessary site visits with staff <br />for up to 24 sign locations, utilizing existing GIS and possible known survey information to develop <br />Construction Documents including foundation designs and location plans based upon the previously <br />developed sign designs for a new quote package. <br /> <br />Please refer to attached Jones Petrie Rafinski Service Fees Schedule. <br /> <br />Owner and Engineer further agree as follows: <br /> <br />1.01 Basic Agreement and Period of Service <br />A. Engineer shall provide, or cause to be provided, the services set forth in this Agreement. If <br />authorized by Owner, or if required because of changes in the Project, Engineer shall furnish <br />services in addition to those set forth above. Owner shall pay Engineer for its services as set forth <br />in Paragraphs 7.01 and 7.02. <br />B. Engineer shall complete its services within a reasonable time, or within the following specific time <br />period: [It is the desire of the City to have these projects ready to quote or bid during Spring <br />2023]. <br />C. If the Project includes construction-related professional services, then Engineer's time for <br />completion of services is conditioned on the time for Owner and its contractors to complete
The URL can be used to link to this page
Your browser does not support the video tag.