Laserfiche WebLink
Manhour Fee Justification <br />Client:City of South Bend <br />Project Name:Ironwood Dr, & Ireland Rd. Intersection Improvements <br />Project No.:22-1089 <br />Manhour Justification Principle / Sr Proj MgrSr. Proj Engr / PM/ Sr. ConsultantSr Engr / Sr Dsgr / Sr Surv.Engr / Dsgr / SurvSr Tech /Sr ObservTechnician / ObserverAdmin2 Man Survey Crew1 Man Survey Crew Task Description Totals Total Fee <br />Task 1 Topographic Survey 0 0 2 24 0 0 2 36 12 76 11,270$ <br />1.0 Utility Locates (Indiana 811 / IUPPS)2 230$ <br />1.1 Establish Control Points / Network 2 270$ <br />1.2 Recon BM's - Conventional (ea +/-) Two person 2 360$ <br />1.3 Recon Lot Corners; Paint Stations - Conventional (ea +/-)2 270$ <br />1.4 Witness Control / Benchmarks 2 360$ <br />1.5 Topographic Survey 2 14 24 8 7,260$ <br />1.6 Structure Data - 2 Person Conventional (ea +/-)8 1,440$ <br />1.7 CAD Drafting 8 920$ <br />1.8 Miscellaneous Office 2 160$ <br />Task 2 Preliminary Design (30%-50%)16 44 142 164 0 0 0 0 0 366 45,730$ <br />2.0 Title Sheet 2 2 480$ <br />2.1 Index Sheet 2 2 480$ <br />2.2 Preliminary Typical Sections 8 16 2,840$ <br />2.3 Preliminary MOT/Pedestrian plans with Signage and note 24 24 5,760$ <br />2.4 Plan and Profile on Aerial Mapping showing exist./prop. elev's for <br />ramps and pavement, show flow arrows to nearby inlets 16 32 5,680$ <br />2.5 Configuration of curb ramps and Islands 16 24 4,760$ <br />2.6 Preliminary Erosion Control Plans 8 16 2,840$ <br />2.7 Preliminary Pavement Marking and Signage Plan 12 16 3,340$ <br />2.8 Miscellaneous details, driveway replacement table, structure <br />replacement table/ incidental work.8 8 1,920$ <br />2.9 Preliminary Quantity Calcs and Cost Estimates 8 12 2,620$ <br />2.10 Preliminary Permit Application- Rule 5 6 8 1,670$ <br />2.11 Preliminary Unique Special Provisions 4 4 1,060$ <br />2.12 Site Visit 8 8 2,120$ <br />2.13 Project Management 12 1,680$ <br />2.14 QA/QC time 16 2,960$ <br />2.15 Mtg with City review / 1 visit PM/Designer visit 8 8 2,120$ <br />2.16 Compliance with City at 50% Review 4 8 16 3,400$ <br />-$ <br />Revised 22-1089 South Bend 2022 Road Rehab - Ironwood Dr. & Ireland Rd. Intersection Fee NT.xlsx 1 of 4