Laserfiche WebLink
Manhour Fee Justification <br />Client:City of South Bend <br />Project Name: <br />Project No.:22-1089 <br />Cleveland Rd & Ameritech Intersection Improvements <br />Manhour Justification Principle / Sr Proj MgrSr. Proj Engr / PM/ Sr. ConsultantSr Engr / Sr Dsgr / Sr Surv.Engr / Dsgr / SurvSr Tech /Sr ObservTechnician / ObserverAdmin2 Man Survey Crew1 Man Survey Crew Task Description Totals Total Fee <br />Task 1 Topographic Survey 0 0 0 26 0 0 2 28 12 68 9,810$ <br />1.0 Utility Locates (Indiana 811 / IUPPS)2 230$ <br />1.1 Establish Control Points / Network 2 270$ <br />1.2 Recon BM's - Conventional (ea +/-) Two person 2 360$ <br />1.3 Recon Lot Corners; Paint Stations - Conventional (ea +/-)2 270$ <br />1.4 Witness Control / Benchmarks 2 360$ <br />1.5 Topographic Survey 16 16 8 5,800$ <br />1.6 Structure Data - 2 Person Conventional (ea +/-)8 1,440$ <br />1.7 CAD Drafting 8 920$ <br />1.8 Miscellaneous Office 2 160$ <br />Task 2 Preliminary Design 12 9 77 81 0 0 0 0 0 179 22,420$ <br />2.0 Title Sheet 2 230$ <br />2.1 Index Sheet 2 230$ <br />2.2 Typical Cross Sections 1 4 585$ <br />2.3 Alignment & Geometrics 4 8 1,420$ <br />2.4 Profile 4 8 1,420$ <br />2.5 Plan & Profile Sheets 4 12 1,880$ <br />2.6 Cross Sections 12 1,380$ <br />2.7 Erosion Control 4 460$ <br />2.8 Signing/Pavement Markings 4 460$ <br />2.9 Maintenance of Traffic 4 60 8,240$ <br />2.10 Intersection Details 8 920$ <br />2.11 Misc. Sheets (Tables, Construction Details)4 460$ <br />2.12 QC/QA 8 8 2,600$ <br />2.13 Project Manual & Specs 2 4 710$ <br />2.14 QTO & Cost Estimate 2 8 1,170$ <br />2.15 Review/Coordination Meetings (1 Max)1 1 255$ <br />Task 3 Final Design 12 15 40 73 0 0 0 0 0 140 17,715$ <br />3.0 Title Sheet 1 115$ <br />3.1 Index Sheet 1 115$ <br />22-1169 SB Cleveland Rd & Ameritech Dr Intersection Fee Prop.xlsx 1 of 3