Laserfiche WebLink
ExhibitE <br />SEWER INSURANCE <br />CONTRACTOR RA TE SCHEDULE <br />December 20, 2022 <br />Pre-qualification category: Second opinion <br />Cable Augering $216.00 Hour <br />Pre-qualification category: Excavation <br />Notes: <br />1.Total crew size shall be a maximu m of two persons unless otherwise approved by the Sewer <br />fnsurance Administrator or representative thereof. <br />2.Equipment costs shall include operator for same. <br />3.Contractor shall invoice all other material used on an itemized basis. <br />4.No rate adjustments shall be made for overtime hours nor fees associated with travel time. <br />5.There will be no fees associated with use of pick-up trucks and trailers. <br />Trip Charge for Excavator <br />Excavator <br />Trip Charge for Other Equipment <br />Rubber tire backhoe <br />Mini Excavator <br />Air Compressor <br />Combination Cleaner Truck <br />Compactor (hand) <br />Dump Truck (20 yd) <br />F350 Dump Truck or Similar/ Trailer <br />Laborer <br />Saw Cutting <br />Trench box. 6' x 6' * <br />Trench box, 8' x 6' * <br />Trench box, 10' x 16' * <br />*When needed, steel sheeting included in cost of trench box. <br />Pre-qualification category: Special <br />$324.00 Job <br />$162.00 Hour <br />$135.00 Job <br />$130.00 Hour <br />$130.00 Hour <br />$119.00 Job <br />$324.00 Hour <br />$54.00 Job <br />$97.00 Hour <br />$76.00 Hour <br />$75.00 Hour <br />$81.00 Job <br />$151.00 Job <br />$324.00 Job <br />$432.00 Job <br />Special conditions shall be address by the Sewer Insurance Administrator through City of South Bend <br />emergency contracting procedures. <br />15