Laserfiche WebLink
City of South Bend <br />Public Works Department <br />2006 Capital Budget Expenditures <br />Di~i.iou - r, oJ~ot title - 1°~oJe~t Dt Yr-rflst:z,'u 2bRG 90(18 2ntYt5 ~et1 oe city oG.oth« OG ott<cr ~C30' CitYYV `2006 >2c117e 2000 Currr i7 ud i~ry[f1~-ffPl <br /> Aeq uc nt Ap~~.oo ~d Feque.t Rource o Fundlne, F1,nd tut; For.,n rd AL~~ - Pruf~c[ L-~q~eudrd , Forw.rd Amt )*xl.c~~~ea< <br />- Punde Name Gource Amt Ad~aatmenta - , <br />t~ <br />Sewer Chapin Street Construction. Project shared with Local Road 8r Street 642 $ 158,458 $ 158,458 $ - <br /> and EDIT Cund <br />Wastewater Disposal of old biosolids Cast stage of project to complete agreed order with $ 800,000 $ 800,000 642 $ 800,000 $ - <br /> at Organic Resources IDEM <br />Wastewater k2 Pump Engine Engine is wom out end needs to be replaced with one $ 500,000 $ 500,000 642 $ 239,856 $ 32,449 $ 701,113 $ 6,294 <br /> Replacement that bums a cleaner fuel <br />Wastewater Polymer teed systems polymer is a coagulant aid that helps the efficiency of $ 300,000 $ 300,000 642 $ - $ - ~ $ 293,000 $ 7,000 <br /> our dewatering process. - - <br /> mixing and blending and control oC precise feed rate <br /> polymer are critical to etiective and efficient use of this <br /> process aid <br />Wastewater 6yd rubber Ure front end Upgrade $ 225,000 $ 225,000 642 $ - $ (89,846) - $ 135,154 <br /> loader 2006 replacement of SN613 <br /> 2009 replacement of SN604 <br /> 2011 replacement o(SN603 <br />Wastewater Digester brick work Repair exterior $ 150,000 $ 150,000 642 $ (150,000) $ - <br />Wastewater Top end overhaul-DC plant process equipment is driven by these engines as $ 133,000 $ 133,000 642 $ - $ 68,979 $ 63,871 $ 150 <br /> part of our power reliability plan-we have a single <br /> ' electric power teed source to the wastewater plant so <br /> we also use alternative fuel engines to power <br /> equipment for reliability. <br />Wastewater Compressor Bldg. Ceiling Replace-tiles Calling oR $ 100,000 $ 100,000 642 $ - $ (90,000) $ - $ 8,500 $ 1,500 <br /> Work <br />Wastewater Scale weight based measure more reliable Ulan volume-most $ 80,000 $ 80,000 64'2 $ - $ 7,850 85,953 $ 1,897 $ - <br /> solid waste facilities(includingyerd waste composting <br /> ehd biosolids management) in the state have switched <br /> to weight basis rather than volume <br />Wastewater Paving at riverside site mobility and aesthetics-some potholes and wom $ 60,000 $ 60,000 642 - $ - $ - $ 15,425 $ 44,574 $ 1 <br /> paving with some heavy equipment using parts of <br /> campus roads <br />Wastewater Resurface biosolids pad $ 60,000 $ 60,000 642 $ - $ - 60,000 $ - <br />Wastewater Roof coating/digesters minimize heat loss from digester roots $ 40,000 $ 40,000 642 $ - $ - $ 40,000 <br /> these million gallon reactors hold waste at 95-98 ' <br /> degrees Fyear-round. It is critical to minimize heat <br /> Toss. <br />Wastewater Primary -plug valves flow control-these provide unit process control and O & $ 30,000 $ 30,000 642 $ - $ - $ 30,000 <br /> M flexibility to isolate certain parts oC the process <br />Wastewater Roof inspection & repair service all buildings as needed $ 30,000 $ 30,000 642 $ 10,277 $ 19,723 <br />Wastewater Concrete repairs as needed $ 30,000 $ 30,000 642 $ 9,082 $ (456) $ 21,765 $ 16,861 <br />Wastewater LiR station upgrades Upgrade and replacements $ 25,000 $ 25,000 642 $ 12,644 $ 18,527 $ 51,825 $ 3,306 $ 1,040 <br />Wastewater SCADA Monitoring central monitoring and control $ 25,000 $ 25,000 642 $ - 24,362 $ 638 <br /> aggregate PLC's in W WTP to central SCADA <br />Wastewater Replacement of chlorine $ 25,000 $ ~ 25,000 642 $ - $ (7,850) $ 17,150 <br /> Piping <br />Wastewater Lab van-SN490 $ 23,500 $ 23,500 642 $ - $ - $ 20,401 $ 3,099 <br />