Laserfiche WebLink
Page 1 <br />Exhibit C –Compensation Packet BC-1: Basic Services (other than RPR) – Lump Sum Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />SUGGESTED FORMAT <br />(for use with E-500, 2008 Edition) <br />This is EXHIBIT C, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated , . <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-1: Basic Services – Lump Sum <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br />ARTICLE 2 – OWNER’S RESPONSIBILITIES <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) – Lump Sum <br />Method of Payment <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of <br />Engineer’s Resident Project Representative, if any, as follows: <br />1. Unless otherwise noted, the Owner shall pay the Engineer on a Lump Sum basis, an <br />amount of $436,500.00 based on the following estimated distribution of compensation: <br />Item Description Amount Type <br />A1.02 Project Management $16,600.00 Lump Sum <br />A1.03 Topographic and Boundary <br />Survey <br />$24,200.00 Lump Sum <br />A1.04 Preliminary Geotechnical <br />Engineering Exploration <br />$5,700.00 Lump Sum <br />A1.05 Limited Drainage Study $29,200.00 Hourly <br />A1.06 Conceptual Planning $78,200.00 Lump Sum <br />A1.07 Preliminary Design Phase $224,000.00 Lump Sum <br />A1.08 Opinion of Probable Cost $10,800.00 Lump Sum <br />A1.09 Graphics and Renderings $8,800.00 Lump Sum <br />A1.10 Environmental Remediation <br />Document Review and <br />Coordination <br />$13,000.00 Hourly <br />A1.11 ORLP Grant Supporting <br />Documents <br />$14,400.00 Lump Sum <br />A1.12 Public Outreach $11,600.00 Lump Sum <br />Total, Not To Exceed $436,500.00 <br />2. Engineer may alter the distribution of compensation between individual phases noted <br />herein to be consistent with services actually rendered, but shall not exceed the total Lump <br />Sum amount unless approved in writing by the Owner. <br />Dec. 13 2022