My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Design and Grant Application Assistance for Kennedy Park Improvements – DLZ Indiana, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Design and Grant Application Assistance for Kennedy Park Improvements – DLZ Indiana, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2022 3:19:16 PM
Creation date
12/13/2022 3:18:55 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/13/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 15 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />15.Applications for Payment: Based on Engineer’s observations as an experienced and <br />qualified design professional and on review of Applications for Payment and <br />accompanying supporting documentation: <br />a. Determine the amounts that Engineer recommends Contractor be paid. Such <br />recommendations of payment will be in writing and will constitute Engineer’s <br />representation to Owner, based on such observations and review, that, to the best of <br />Engineer’s knowledge, information and belief, Contractor’s Work has progressed to the <br />point indicated, the Work is generally in accordance with the Contract Documents <br />(subject to an evaluation of the Work as a functioning whole prior to or upon <br />Substantial Completion, to the results of any subsequent tests called for in the Contract <br />Documents, and to any other qualifications stated in the recommendation), and the <br />conditions precedent to Contractor’s being entitled to such payment appear to have <br />been fulfilled in so far as it is Engineer’s responsibility to observe Contractor’s Work. <br />In the case of unit price work, Engineer’s recommendations of payment will include <br />final determinations of quantities and classifications of Contractor’s Work (subject to <br />any subsequent adjustments allowed by the Contract Documents). <br />b. By recommending any payment, Engineer shall not thereby be deemed to have <br />represented that observations made by Engineer to check the quality or quantity of <br />Contractor’s Work as it is performed and furnished have been exhaustive, extended to <br />every aspect of Contractor’s Work in progress, or involved detailed inspections of the <br />Work beyond the responsibilities specifically assigned to Engineer in this Agreement <br />and the Contract Documents. Neither Engineer’s review of Contractor’s Work for the <br />purposes of recommending payments nor Engineer’s recommendation of any payment <br />including final payment will impose on Engineer responsibility to supervise, direct, or <br />control Contractor’s Work in progress or for the means, methods, techniques, <br />sequences, or procedures of construction or safety precautions or programs incident <br />thereto, or Contractor’s compliance with Laws and Regulations applicable to <br />Contractor’s furnishing and performing the Work. It will also not impose responsibility <br />on Engineer to make any examination to ascertain how or for what purposes Contractor <br />has used the moneys paid on account of the Contract Price, or to determine that title to <br />any portion of the Work in progress, materials, or equipment has passed to Owner free <br />and clear of any liens, claims, security interests, or encumbrances, or that there may not <br />be other matters at issue between Owner and Contractor that might affect the amount <br />that should be paid. <br />16.Contractor’s Completion Documents: Receive, review, and transmit to Owner <br />maintenance and operating instructions, schedules, guarantees, bonds, certificates or other <br />evidence of insurance required by the Contract Documents, certificates of inspection, tests <br />and approvals, Shop Drawings, Samples and other data approved as provided under <br />Paragraph A1.05.A.11, and transmit the annotated record documents which are to be <br />assembled by Contractor in accordance with the Contract Documents to obtain final <br />payment. The extent of such review by Engineer will be limited as provided in Paragraph <br />A1.05.A.11. <br />17.Substantial Completion: Promptly after notice from Contractor that Contractor considers <br />the entire Work ready for its intended use, in company with Owner and Contractor, visit the
The URL can be used to link to this page
Your browser does not support the video tag.