Laserfiche WebLink
DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />FINAL COMPARISON OF ESTIMATES <br />CONTRACT VS FINAL <br />Project No. <br />No.ITEMS Quantity Placed <br />Over/ <br />Under UNIT UNIT PRICE EXTENSION <br />Project Name: <br />Contractor: Rieth-Riley Construction Co., Inc.121-052 <br />2021 Community Crossings <br />Round 2 <br />1 D1 Kemble - Maintenance of Traffic 1 1 0 LS $7,500.00 $0.00 <br />2 D1 Kemble - Mobilization and Demobilization 1 1 0 LS $14,643.75 $0.00 <br />3 D1 Kemble - Milling, up to 3"6641 6134.3 -506.7 SY $3.40 -$1,722.78 <br />4 D1 Kemble - HMA Surface, 9.5 mm – Type B 559 487.21 -71.79 TONS $98.00 -$7,035.42 <br />5 <br />D1 Kemble - HMA Intermediate, 12.5 mm - <br />Type B 461 421.25 -39.75 TONS $84.50 -$3,358.88 <br />6 D1 Kemble - HMA for Patching 12 0 -12 TONS $160.00 -$1,920.00 <br />7 D1 Kemble - Tack Coat 2 2 0 TONS $1.00 $0.00 <br />8 D1 Kemble - Joint Adhesive, Surface 1843 3268 1425 LF $0.50 $712.50 <br />9 D1 Kemble - Adjust Manhole to Grade 3 1 -2 EA $250.00 -$500.00 <br />10 <br />D1 Kemble - Adjust Water Valve Structure to <br />Grade 2 1 -1 EA $80.00 -$80.00 <br />11 D1 Kemble - Adjust Inlet to Grade 6 0 -6 EA $250.00 -$1,500.00 <br />12 <br />D1 Kemble - Line, Thermoplastic, Solid, <br />White, 6"74 70.4 -3.6 LF $1.88 -$6.77 <br />13 <br />D1 Kemble - Line, Thermoplastic, Solid, <br />Yellow, 4"2800 2637.4 -162.6 LF $0.58 -$94.31 <br />14 <br />D1 Kemble - High Contrast Chevron, <br />Multi-Component 6 6 0 EA $935.00 $0.00 <br />15 <br />D1 Kemble - Grooving for Pavement <br />Markings, 4"2800 2637.4 -162.6 LF $0.54 -$87.80 <br />16 <br />D1 Kemble - Transverse Marking, <br />Thermoplastic, Solid, White, 24"17 17.4 0.4 LF $11.75 $4.70 <br />17 D1 Kemble - Concrete Curb Ramp, Removal 80 87.8 7.8 SY $70.00 $546.00 <br />18 <br />D1 Kemble - Concrete Curb Ramp, <br />Installation 80 87.8 7.8 SY $205.00 $1,599.00 <br />19 D1 Kemble - Concrete Speed Hump 3 3 0 EA $15,000.00 $0.00 <br />20 D1 Kemble - Tree Removal 1 1 0 EA $2,000.00 $0.00 <br />21 D2 Bowman - Maintenance of Traffic 1 1 0 LS $5,500.00 $0.00 <br />22 D2 Bowman - Mobilization and Demobilization 1 1 0 LS $10,738.75 $0.00 <br />23 D2 Bowman - Milling, up to 3"4712 4506.88 -205.12 SY $3.40 -$697.41 <br />24 D2 Bowman - HMA Surface, 9.5 mm – Type B 389 377.67 -11.33 TONS $98.00 -$1,110.34 <br />25 <br />D2 Bowman - HMA Intermediate, 12.5 mm - <br />Type B 389 414.42 25.42 TONS $84.50 $2,147.99 <br />26 D2 Bowman - HMA for Patching 7 0 -7 TONS $160.00 -$1,120.00 <br />27 D2 Bowman - Tack Coat 2 2 0 TONS $1.00 $0.00 <br />28 D2 Bowman - Joint Adhesive, Surface 1303 1410 107 LF $0.50 $53.50 <br />29 D2 Bowman - Adjust Manhole to Grade 2 0 -2 EA $250.00 -$500.00 <br />30 <br />D2 Bowman - Adjust Water Valve Structure to <br />Grade 1 0 -1 EA $80.00 -$80.00 <br />31 D2 Bowman - Adjust Inlet to Grade 4 0 -4 EA $250.00 -$1,000.00 <br />32 <br />D2 Bowman - Line, Thermoplastic, Solid, <br />White, 6"121 114.1 -6.9 LF $1.88 -$12.97 <br />33 <br />D2 Bowman - Transverse Marking, <br />Thermoplastic, Solid, White, 24"24 29.6 5.6 LF $11.75 $65.80 <br />34 D2 Bowman - Concrete Curb Ramp, Removal 125 105.2 -19.8 SY $70.00 -$1,386.00